CanuckSigns
Active Member
I'm curious what the average lead time is for basic signs, we are fairly busy right now, and had a client contact us for a 10'x16' print on ACM, installed on the side of a building, and a few.odds and ends such as sandwich board signs, hours on door etc. I told them they are looking at about 3 weeks for production and installation and they seemed shocked.
I was wondering if I'm out of line on this one,. If it was supply only I could do it quicker, but since the install is higher up than I'm comfortable doing myself, I'm relying on a sub contracted installer, and all the good ones are booking up months in advance as soon as the nice weather hits.
Is 3 weeks really that long for something like this?
I was wondering if I'm out of line on this one,. If it was supply only I could do it quicker, but since the install is higher up than I'm comfortable doing myself, I'm relying on a sub contracted installer, and all the good ones are booking up months in advance as soon as the nice weather hits.
Is 3 weeks really that long for something like this?