high impact
New Member
I apologize to sign boy for not answering his question.
I'd think Jill's recommendation is a little low and I would consider it the minimum increase in price. Take into consideration the difficulty of the shape you have to cut. I always assume how long it will take to cut them accurately and then figure straight shop rate. I also don't care for doing them so the price needs to be high enough to justify standing there cutting them or paying someone to do it and potentially mess one or two up and still have some profit built in. ;-)
Tough call - let us know how it works out.
I'd think Jill's recommendation is a little low and I would consider it the minimum increase in price. Take into consideration the difficulty of the shape you have to cut. I always assume how long it will take to cut them accurately and then figure straight shop rate. I also don't care for doing them so the price needs to be high enough to justify standing there cutting them or paying someone to do it and potentially mess one or two up and still have some profit built in. ;-)
Tough call - let us know how it works out.
