tulsagraphics
New Member
I wouldn't worry about anyone else's bids. Competitors are going to deal with the same job requirements as you are, and the ones who cut corners to save a few bucks shouldn't be counted as your competition anyway. They're only hurting themselves -- so let them.The architect calls for ".5" sign board". In other words, they don't know what to specify except to say that they do not want aluminum composite material. I've gotten other requests from this architect before, and I usually pass on the jobs because their specs seem unreasonable. However, this job I am looking at is fairly simple, but I see the black substrate as being an issue. We have lost money in the past by replacing warped black PVC. ACM is now what we typically use for this type of sign. If we go with Color Core it will most likely put the price out of a competitive range. This is looking like a time waster trying to figure out. They will probably go with the lowest bidder which won't be us.
Bid a job to make it worth your while -- without compromising your standards. You need to make enough to justify the quality of work you do, potential warranty work or any damage that may occur during production or install. In most situations you should be able to bid enough so that if a job goes south you still have enough margin to break even with a full replacement (at minimum). If you're less than that, the bid is too low.
Also, give clients options, not a single price. Show them the different materials, durability ratings and their associated price ranges. You'll get better feedback (and win more bids) that way -- because if you give them a "single best" number, then they're ONLY going to look at that number when comparing bids and nothing else.