• I want to thank all the members that have upgraded your accounts. I truly appreciate your support of the site monetarily. Supporting the site keeps this site up and running as a lot of work daily goes on behind the scenes. Click to Support Signs101 ...

Dimensional Letter on Brick Building My price Vs. Yours

S

SignTech

Guest
We are doing this project now. Pretty straight forward.

Probably using Gemini or Scott. I worry about GOOD templates. But that's not the question.

I calculated materials x2 which includes the letters and the template plus shipping. Right around $900.00.

Using injected molded black matte finish lettering NOT aluminum.

Lots of small holes to drill up about 1 1/2 stories as you can see in the picture ... estimated full day ONE MAN with scaffolding. Probably not a full day (7 hours) but just in case. $80 an hour. $560.00 JUST LABOR.

$300.00 for scaffold, insurance, bits, and PITA factor.

I come up with $ 1,760.00

What do you come up with?
 

Attachments

  • WB-Bulding-Lettering.jpg
    WB-Bulding-Lettering.jpg
    180.8 KB · Views: 2

Pat Whatley

New Member
I come up with $1520 installed, more power to you if you get more!

I don't know what kind you've got but the last job I did that required a lot of drilling we rented a second hammer drill, it just happened to be a Hilti. We were drilling holes with it at a rate of almost 10 to 1 over our Bosch. Amazing, almost like drilling wood. Rental was only $30 and probably saved me two hours of labor.
 

thmooch

New Member
Looks right to me. 5-7 hrs install. I usually rent a lift for a job like this. Yeah, really the only thing is to mark the template before heading to the site...but you already know this.
 
S

SignTech

Guest
I come up with $1520 installed, more power to you if you get more!

I don't know what kind you've got but the last job I did that required a lot of drilling we rented a second hammer drill, it just happened to be a Hilti. We were drilling holes with it at a rate of almost 10 to 1 over our Bosch. Amazing, almost like drilling wood. Rental was only $30 and probably saved me two hours of labor.

Very nice response. Thank you! So we are pretty close in price. Good to hear. Mike
 

3dsignco

New Member
Gemini Times New Roman 14-10" 16- 8" Combination Mount. I just add 50% to the Suggested Retail to cover shipping and Misc. $1026.50
6 Hours Labor 1 man @ $125 HR $750
We own our Own Scissors Lift so its included in our Hourly.
Permits $75.
Total $1851.50
 

high impact

New Member
I think you are on the money Mike...

But man, you are a glutton for punishment! ;-) Rent a lift....that job will go much faster with a lift. Toughest part is drilling.
 

high impact

New Member
On second thought, I just took a look at the picture. I think you are wayyyyyyyyyyyyyyyyyyyyyy low on price. It's gonna cost a ton to remove that telephone pole like that.
 
S

SignTech

Guest
Gemini Times New Roman 14-10" 16- 8" Combination Mount. I just add 50% to the Suggested Retail to cover shipping and Misc. $1026.50
6 Hours Labor 1 man @ $125 HR $750
We own our Own Scissors Lift so its included in our Hourly.
Permits $75.
Total $1851.50

Wow thanks ....... we are getting good at this Sh*&! LOL ... yeah the hourly rate may need to climb a bit. Usually it's $65.00 in shop, 80 out of shop simple installs and up from there with lifts etc ...

Thanks.
 
S

SignTech

Guest
On second thought, I just took a look at the picture. I think you are wayyyyyyyyyyyyyyyyyyyyyy low on price. It's gonna cost a ton to remove that telephone pole like that.

Thanks ....... I already removed the telephone pole ........ lol
 

Tom

New Member
I figured it at about $1900.00 for this area.

If you don't have a hilti, I would also reccomend renting one. It will cut the install time.
 
S

SignTech

Guest
I figured it at about $1900.00 for this area.

If you don't have a hilti, I would also reccomend renting one. It will cut the install time.

My hammer drill is not Hilti ........ awwwwwwwwwwwww now I have to get a new toy!
 
S

SignTech

Guest
I figured it at about $1900.00 for this area.

If you don't have a hilti, I would also reccomend renting one. It will cut the install time.

I see why renting them is a better option. Pricey.
 
Top