Scott Hyon
New Member
Hello Everyone,
Just wanted some input on installation charges for some lettering on a 24' straight truck. I just got out bid on a job to install lettering and logos on 40 trucks. The lettering and logos would be installed on the three sides of the box. The job included on-site install ( the sites varied from 30 min to 4 hours drive), cleaning of the substraight, and installation of the decals. The customer is providing the lettering and logos. I estimated the job at $450 per turck. Is that too high or too low?
Thanks
Scott Hyon
Beyond Graffix Auto Ink
Just wanted some input on installation charges for some lettering on a 24' straight truck. I just got out bid on a job to install lettering and logos on 40 trucks. The lettering and logos would be installed on the three sides of the box. The job included on-site install ( the sites varied from 30 min to 4 hours drive), cleaning of the substraight, and installation of the decals. The customer is providing the lettering and logos. I estimated the job at $450 per turck. Is that too high or too low?
Thanks
Scott Hyon
Beyond Graffix Auto Ink