Installation Pricing Questions

Brandon708

New Member
I didn't see anything on here about installation costs. I just want to ask some sign company owners their opinions on pricing.
I have a sign installation business and I install for customers and sign companies.

I have a 34' Bucket Van and all the augers, ladders and tools needed to install signs. I do not do electrical work. Although I wish I could.

- Bucket lift work mininum $150
I charge $150 and add extra $ for any extra work or diffucialty that is invloved. Example I usualy charge $150 to hang a 4x8 banner or sign but will add $25-$50 if its really high and akward. If there is (2) signs I will add $25-$50 also.

Very large banners like 5'x25'+ would be around $250 (ususaly installed to brick) And to take down I charge $150.

For things like pole banner installs I will charge $90 to install all hardware or just $50 if I got to slip on banner and adjust the bottom bracket to get it tight. per job assuming that there are more than just one pole that I have to do. But at a minimum of ($150)

Light box panels start at $150 also and go up depending on size just like the banners.

For signs on the ground like 4x8 omega board signs I charge $150 to install them with 4"x4" pressure treated posts painted white set in concrete.
A pricing guide I use is $75 per post/hole so tri would be $225 ect...

As for U-Channel post I charge $75 per sign

What do you all think of these prices? I am comfortable with these prices and most of my customers are too. Sometime I get lowballers and it makes me think. A new sign company that I quoted to install 150 poll banners I quoted them $40 per poll. He told me that someone quoted him less than half of that. I said I would think about it. Being on a busy road and Installing these pole banners is dangerous. You have to set up cones and move them each time you go to the next one so I don't know how someone is doing it for half of what I quoted.

Your opinions would be appreachated.

THANKS!!!!!
Brandon
 

Circleville Signs

New Member
I think you have a strange pricing structure. I've honestly never seen an installation business with a structure like that.

If I were you I would br pricing by the hour. For example, our shop rate is $65/hr. Our Field rate is $75/hr for 1 man with a bucket and $125/hr for 2 men with a bucket.

If a crane is needed, then the price of crane rental is added into the quote. So, for us, installing a 4'x8' cabinet onto a 12' steel pole, that is already set, and already has a mounting plate in place would probably be around 4 hours w/2men + any extra equipment needed.

On the scenario that you gave us, I'd need to know how high off the ground the banners are going, etc. I'm assuming that they are high enough that you'd need to use your bucket. If so, then I would think around 20 mins/pole if you used a couple hours of shop time to get them ready for install in advance. It's a one man job, so we would quote that at around $25/pole, and assume that we could get 24 poles/day done. So, it's a week's worth of work for $3,750.00. I would probably knock off a little bit to get the job if I had to.

Long story short, your $40/pole is probably a little high, at least in my market.


Gary
 

Brandon708

New Member
Gary,

So if you installed a banner with your bucket and it took you 20 minuites you would charge $25 to hang it? I would spend half that in gas to get to and from location.

I dont know if an hourly pricing structure would work for me. I am the owner and only installer so I wouldn't take as long as someone getting paid by the hour if you know what I mean. I get these done as quickly as possible with out waisting any time.

I thought about doing an hourly rate when I first started but I figured it wouldn't work. So i decided to price by job.
 
At a place I used to work we would charge $125.00 for a truck roll if the installers feet did not leave the ground, once he was in the air (via bucket or ladder) it went to $165.00, anything with a crane or large box installs were quoted at 65.00 an hour per man and a $165.00 trip charge per truck.

These prices may have gone up, I have not worked there for 4-5 years.


Hope it helps!
 