• I want to thank all the members that have upgraded your accounts. I truly appreciate your support of the site monetarily. Supporting the site keeps this site up and running as a lot of work daily goes on behind the scenes. Click to Support Signs101 ...

Need some help on pricing

I was wondering if I could get some input on pricing a job.I have a customer that needs some display stands lettered,30 stands at a time,probably 250 to 300 total by the time its all said and done.Each stand requires (2) 8"x7" printed logos that I will be sending out to be printed,one on each side,and 3 lines of vetical text,all applied in one piece,one color on both sides.I will be using Oracal 651 for the text that measures 12"x28" over all.These will be installed at the customers location which is about 30 miles round trip from me.Could someone help get me in the ball park here,on a per display price.I dont normally do jobs of this quanity or on displays like these. Thanks alot.
 

Cross Signs

We Make Them Hot and Fresh Everyday
If the stands are all the same size, how about a digital print for the whole thing...including all lettering. Then you could itemize the prints and installation prices a little easier
 
These stands have screw holes in the sides where the cut lettering is going that have caps that pop in to cover them(but stick out quite a bit,way too much to try and cover).Ive designed the lettering to avoid the screw holes ,took alot measuring and remeasuring to do so but Ive managed to avoid them and still look good and centered.I know printing would be easier but I think the cut lettering will look alot better in the end.Im printing the logos only because they are fairly small and 4 colors.
 

Checkers

New Member
There are too many variables you need to address. However, IMHO, screen printed and die cut decals are the way to go if you want to be competitive.
The client orders all the decals upfront for $XXX.
Then you itemize out a price for each install, plus a trip charge.
The trip could be just time and mileage and installation shouldn't take more than 10 to 15 minutes per unit.

Checkers
 
Top