Actually Flame you are wrong.
I was going to post something about this, but since the door is open......
Lets look at it this way. You feel you are better than the next guy - why? I feel the same way - as does everybody else. We are not talking about humility...we are talking about pride. You can be proud and humble AT the same time.
Square footage should be used as a reference - not a bible. The SF dollars come in to give you a baseline for a profit - but how often do you do the same job? If you think from the Henry Fords standpoint, then
you are really overcharging for digital work - or are you???
I think you are giving it away, as is everybody else, along with the vinyl, etc, etc - except for electrical contractors - they learn from a different and smarter angle.
Pleeeaase....somebody tell me what IS standard about the signage business! Not a damned thing - other than just the substrates. There is a lot of thought that usually goes into everybody's work AND nobody
really charges for it - including myself, but I am very concious of it and do my best to avoid giving it away.
Here is an example. Doing a job for a foofoo joint. The business is pre-existing, and somebody already made the money on the pole
sign and building letters. The place still needs to get rockin' and rollin because it is not where it was before they moved a block away. Problem #1 is that the illuminated pole
sign is way too small (IMO) and obscure with the copy (also smallish). The dimensional letters blend into the building - useless.
What do I tell this lady? Scrap everything and start over - she just paid for it. This is one of those keep your mouth shut situations. Now I need ot come up with somethiung that will grab a motorists attention.
Total thought = 6 HOURS!!!!!!!
What did she buy?.......2 - 4x8 billboards, and 1 - scroll hanging 30"x 60". Total cost to her $1475. Fast
Many will say: "that's too much, can't get that here". We were $600 MORE than the quickie
sign company, up the street. The difference, we explained this is: "how, what, where, and why". The lady could not give the deposit fast enough.
Had we stuck to standard pricing, we would have lost $600.
Now a realtor comes in and wants a
sign - that is standard, and of course a minimum. SF pricing.
The next person we get may want the same types of
signs, and the prices will be different, depending on what they need us to do. If we must think, they must pay. We have a saying in the automotive business - "sure the screw only costs 50 cents, but it will cost you 10 dollars BECAUSE I know how far to tuen it".
We do a lot of reproduction stuff, in other words no designing of the original layout, but that does not mean that the 4x8 will be as much as, or even less than the next. This is where experience comes in, AND where many people cheat themselves. This is why, in Orlando, a person can get 2 doors done for $125, which is also why when they want to add a body stripe, it is now $325 vs. the $200 that it once was.
As for customers being friends...that BULL. They all want to brag that they spent more than the next guy BECAUSE theirs had a greater degree of difficulty.
Following me so far?