Paul Considine
New Member
Hi,
I was wondering if anyone had experienced unusually long wait times as an ICC Profile is generated?
I have a low patch count and excellent read values, but yet the Java console goes on an extended trip for up to 2-3hrs as it's building the final ICC mix.
Thanks in advance...
Paul
I was wondering if anyone had experienced unusually long wait times as an ICC Profile is generated?
I have a low patch count and excellent read values, but yet the Java console goes on an extended trip for up to 2-3hrs as it's building the final ICC mix.
- Loads of Ram
- Lots of Disk Space
Thanks in advance...
Paul