What you're essentially talking about is a PDM (Product Data Management) system. These are usually Oracle databases (not to be confused with Oracal vinyl). At my previous career in aerospace engineering [and temporarily current again, but different company], we instituted a system called TeamCenter sold by UGS. This took a couple of years to work MOST of the bugs out to where it didn't make you want to go home and kick the dog every night.
What it is, essentially, is a big soup-pot that collects and maintains ALL of your data...whether it be a Word document, Excel spreadsheet, Corel file, Flexi file, JPEG images, etc. The system doesn't really care what file formats you have because it is, in a nutshell, simply a container for all of the data. The cool thing is that you can set up relationships between all of this data and the single best thing, is that you have a SINGLE SOURCE OF DATA. This in itself is a big deal from a design and manufacturing standpoint.
You can also set up workflows for your data. First you collect all the data related to that project, and/or link to existing data (reuse old data from previous projects if applicable). Then after you work on the data (design), you send it thru a review process that can then email checkers, supervisors, whomever, who then electonically
sign the drawing. After final approval, the system releases the work package and locks it down so you can't alter the data...until you check out a revision, then the process can repeat. At this point you can also move it over to the manufacturing side, which may have it's own workflow(s) and revisions. Now this mostly pertains to large projects, of course, but you can see the process.
Personally, I think this is WAY overkill for all but the mightiest of shops, but I think the ideas can be scaled back and used at any level.
Oh and the costs associated with such a beast are quite substantial as was mentioned. You first have the hard costs of the software (and likely extra hardware of a dedicated server). Then you have the training, the support, people to run it and oversee it's operation, etc. etc. I don't know all the costs, but it was in the few million$.