Hey folks,
I have a monument sign I'm supposed to submit a bid on. The sign is going to be made of brick, to match an existing twin sign.
The dimensions are:
82" high by 72" wide, but 9.5" deep.
Single-sided, with dimensional letters.
I had a subcontractor go out and work me up a bid to build it, since he's a bricklayer, and I've never laid brick. The price he quoted me was $1000.00 even, if I provide him with a pallet of brick.
Now here's my question: Am I justified in marking this cost by 100%? I usually would say yes, but I'm not sure if I'm making this too expensive.
Thanks!
I have a monument sign I'm supposed to submit a bid on. The sign is going to be made of brick, to match an existing twin sign.
The dimensions are:
82" high by 72" wide, but 9.5" deep.
Single-sided, with dimensional letters.
I had a subcontractor go out and work me up a bid to build it, since he's a bricklayer, and I've never laid brick. The price he quoted me was $1000.00 even, if I provide him with a pallet of brick.
Now here's my question: Am I justified in marking this cost by 100%? I usually would say yes, but I'm not sure if I'm making this too expensive.
Thanks!