southpawP8NTR
New Member
We just finished the preliminary work today for our addition to our shop. We made a wheel chair accessible ramp and railings for our side entrance because with the remodel we lose our front entrance for a month or so. Put out the signage and ran ads in the local newspaper to redirect customers around the contractor and his crew. We also re-arranged a wall to direct customers to the front lobby and away from the production area.
We break ground Monday after months of city issues and permit pulling
.
I hope we all survive this, alot of changes coming.
Has anyone else gone through this situation recently and did I miss anything that would help ease the inconvenience?
I attached a pdf of 3d model but it has some gliches with the pics of the existing building.
Thanks
We break ground Monday after months of city issues and permit pulling
.I hope we all survive this, alot of changes coming.
Has anyone else gone through this situation recently and did I miss anything that would help ease the inconvenience?
I attached a pdf of 3d model but it has some gliches with the pics of the existing building.
Thanks
...if we ride down that way anytime soon ill swing in and say hello....LOL you'll know its me when ya got 50 Harleys pulling in your lot hahahaha ......im also looking to have my tins painted up as soon as i tear her down.....i always admired your work and would love to have ya paint her up sometime.