• I want to thank all the members that have upgraded your accounts. I truly appreciate your support of the site monetarily. Supporting the site keeps this site up and running as a lot of work daily goes on behind the scenes. Click to Support Signs101 ...

Time estimate information to use for pricing.

Fred Weiss

Merchant Member
Checkers ... why would you consider an interruption as an expense to be charged against the job you happen to be working on? If I were actually tracking time and had an interruption, then I would stop my timer and restart when I returned. If a job took two hours to complete but took me four hours because of interruptions, I think it's still just two hours of labor that the customer is buying.
 
I think what Brian is saying is that the actual realized profit "on the hour" would be $100/4, and not 2 - which many people fail to take into account when calculating costs and pricing.

Here is another example. I had learned to never count on a mechanic producing more than 5 billable hours, out of an 8 hour day.
 

Fred Weiss

Merchant Member
I agree that there is no way to bat 1,000 on billable hours per day which is something that should be taken into account when establishing a shop rate. I'm just saying that it would be a totally improper accounting practice to charge 4 hours as an expense against a job that you only billed at two hours. The expense should be placed against whatever activity was conducted during the interruption.

If Brian is on the phone for two hours closing a deal for $10k worth of signs, should that two hours be charged against the 4 x 8 he was working on at the same time.

The simple fact is that most of us multi-task most of the time anyway. So we figure up how long any activity should take and therefore be billed at. If, while I'm applying that 4 x 8 I also keep a plotter going and overlap two hours of machine cutting time, does that customer get a reduced price?

I understand what Brian is saying ... that interruptions may represent a loss. But I also felt that someone else might read it differently.
 

Checkers

New Member
Just to clarify, when I stop work on a job to perform some other task, I don't bill my time to the first job. Perhaps a better word would be distractions, or short interruptions that occur during the job is what I'm referring to. Things like a trip to the library, or a short mental or smoke break during the job is time that is included as billable time on the job.
Even though I may be in the shop working for 10 hours, I'm lucky if I can bill clients for 6 hours of my time. The 4 hours I loose performing other tasks is what I consider as part of doing business and figured into my overhead and/or expenses. This time is spent doing other things that are not billable to any specific job or project. They include client visits and sales calls, estimates, or even cleaning the restroom.

Checkers
 

THATgirl

New Member
HEY FRED....where is the link to that timer you posted a year or so ago. aboveallgraphics would like it I think. That little timer is great.
 

Fred Weiss

Merchant Member
THATgirl said:
HEY FRED....where is the link to that timer you posted a year or so ago. aboveallgraphics would like it I think. That little timer is great.
It comes from a company that is or was known as Ampersand Software. I just googled them with no find. The application has a date of 1998 but installs and runs just fine on my Win XP Pro system. I keep it in the Quick Launch section of my Task Bar.

Here's a copy of it. Although it shows a license and copyright on installation, my recollection of it is that it was distributed as freeware. Enjoy.

Job Timer Program Download
 

gvgraphics

New Member
Above all - I guess a better way to explain it would be this. It takes about 10 min to cut, 15 - 20 min to weed, mask and apply. Our shop rate for this area is $45. Now there is about 30 min into this sign. Thats $22.50 plus material. Say around $30 total. I know we only charge $15 for the sign but this is why. Reason number one - our area and the fact that other shops that where here before us set such a low price on these. Reason number two - They can bring in larger jobs. This is the only reason we do these. Now we don't stop what we are doing to make them but make them on down time or in between jobs. No, we really don't profit on them, but 60% of the time we get more work from them that is profitable. So there for we do these jobs in hopes of a pay day. Hope this helps answer your questions.

Sean
 
They call them loss leaders. Like the 12.95 oil change or the $30 tune-up. That methodology has been around since the dinosaurs, and there is nothing wrong with it AS LONG as it works for you. As I stated, we consider them to be incendental and give many away - to our existing customers. (Please don't think that we do that for orders of multiples). Some must nickle and dime everything all along the way. We try and build enough profit that when we appear generous when needed.
 
Top