• I want to thank all the members that have upgraded your accounts. I truly appreciate your support of the site monetarily. Supporting the site keeps this site up and running as a lot of work daily goes on behind the scenes. Click to Support Signs101 ...

trailer wrap pricing

Signed Out

New Member
Been getting quite a few trailer wrap jobs in lately and want to see how my pricing compares. We use oracal 3751 ra and 290 lam.

When pricing I mark up material 225% and charge labor at $75 per hour. For larger jobs like wraps I usually drop the markup down to about 150-175%.

Most recent was a 16' enclosed trailer, full wrap on all 4 sides. 1 door on the side and a bottom hinged door on the back. Total sqft covered was about 350 + waste material. We wrapped it for $2,200. I feel that this was a bit low. Especially since it took us logner than expected to install the wrap. Took us aobut 22 man hours. We aren't the fastest installers but are getting quicker, and when I price these things out I usually price it as how much time it should take if we were as quick as I think we should be.

Also recently was a full wrap on both sides, no front or back, of a 54' trailer. Can't remember the sqft, but we got $7,400 for it and it took about 24 man hours to install.

Putting a quote together now for a 12'x6' enclosed trailer to get a wrap on all 4 sides, trailer has a door on one side and split doors on the back. Total sqft covered is 167, about 240 sqft of material used with waste added in. I think a wrap like this should take 6-8 hrs to install, probably take us aobut 10, plus time to print, lam, trim, another 2 hrs there. With 10 hrs figured in I'm coming up with $1,675. Does this price sound about right? Also please comment on the amount of time we take to wrap and how much time it should take to wrap.

Thanks,
 
Last edited:

HulkSmash

New Member
for the 350 sqft trailer, i'd be about a grand or more higher.

also for the semi we get quite a bit more.

240 sqft.. add another 8-900..

The way you're pricing does cover costs and most labor, but there is value in what you do... not everyone can do it..
so yes, you're leaving a lot of money on the table..




question, how does a trailer 16' long take as long as a 52' semi....
 

Signed Out

New Member
Thanks for the reply. Wow didn't think I was that far off. The 52' took us aobut the same time becasue there were no obstructions like doors, hinges, lights, fenders, etc. just a ton of rivets. The 52' was just the 2 sides, no front and back like the 16'. Also with the 52' we did the install on the weekend so we were free from distractions (phone, walk-ins, etc) we're a 2 man shop. But still the 22 hrs I said for the 16' was time spent on the install (not including distractions) but I think jumping on and off and back on... adds in some time.

How much labor time should it take to install these wraps I've described, 12', 16', 52' if done straight through by very experienced installers?
 

HulkSmash

New Member
Thanks for the reply. Wow didn't think I was that far off. The 52' took us aobut the same time becasue there were no obstructions like doors, hinges, lights, fenders, etc. just a ton of rivets. The 52' was just the 2 sides, no front and back like the 16'. Also with the 52' we did the install on the weekend so we were free from distractions (phone, walk-ins, etc) we're a 2 man shop. But still the 22 hrs I said for the 16' was time spent on the install (not including distractions) but I think jumping on and off and back on... adds in some time.

How much labor time should it take to install these wraps I've described, 12', 16', 52' if done straight through by very experienced installers?


12, 16 ft trailers, under 8 hrs 1 guy.

semi, 1 guy on each side, come back and do the rivets in the end with a rolle pro
 

Signed Out

New Member
Damn, that's fast. I've seen your posts about install times before and I'm always thinking, "we'll get there."

Can I pick your brain some more?

When we do semi trailers (done 3 so far) we have 2 people. First both people clean one side of trailer. Then both people tape up and align the first panel (we always use 2 people to do this, probably need to learn to do by oneself) One person stays and squeeges down that panel while other person starts to clean other side. Whenever the squeegeier finishes a panel the other guy helps to align the next one (we seem to take quite a bit of time aligning panels, sometimes as long as 10-15 mins trying to get it perfect.) Once the other side of the trailer is clean, that person comes over and follows the squeegeier doing rivets and cutting seams.

Thinking we need to train ourselves to be able to align and lay a panel by oneself and get better at aligning panels. Any advice or tips on this?

We do use the rolle pro for rivets, but I know we can get faster at this too. We try to leave a nice fairly flat open chanel on the rivets. Start at the top and prick roll v's on the bottom of every rivet, then heat 4-5 rivets at a time and roll down. I've learned that if you have a nice chanel then you don't need to prick roll the vinyl, but a lot of times the chanel gets closed off or isn't very flat.

Any advice on this?

I think I have some more youtube to watch.
 

mudmedia

New Member
Damn, that's fast. I've seen your posts about install times before and I'm always thinking, "we'll get there."

Can I pick your brain some more?

When we do semi trailers (done 3 so far) we have 2 people. First both people clean one side of trailer. Then both people tape up and align the first panel (we always use 2 people to do this, probably need to learn to do by oneself) One person stays and squeeges down that panel while other person starts to clean other side. Whenever the squeegeier finishes a panel the other guy helps to align the next one (we seem to take quite a bit of time aligning panels, sometimes as long as 10-15 mins trying to get it perfect.) Once the other side of the trailer is clean, that person comes over and follows the squeegeier doing rivets and cutting seams.

Thinking we need to train ourselves to be able to align and lay a panel by oneself and get better at aligning panels. Any advice or tips on this?

We do use the rolle pro for rivets, but I know we can get faster at this too. We try to leave a nice fairly flat open chanel on the rivets. Start at the top and prick roll v's on the bottom of every rivet, then heat 4-5 rivets at a time and roll down. I've learned that if you have a nice chanel then you don't need to prick roll the vinyl, but a lot of times the chanel gets closed off or isn't very flat.

Any advice on this?

I think I have some more youtube to watch.

Don't worry. It takes us awhile to align panels up as well. On vehicles not so much because it is easier with magnets. I wish we were faster at aligning panels but we over think it a lot I am sure.
 

HulkSmash

New Member
Damn, that's fast. I've seen your posts about install times before and I'm always thinking, "we'll get there."

Can I pick your brain some more?

When we do semi trailers (done 3 so far) we have 2 people. First both people clean one side of trailer. Then both people tape up and align the first panel (we always use 2 people to do this, probably need to learn to do by oneself) One person stays and squeeges down that panel while other person starts to clean other side. Whenever the squeegeier finishes a panel the other guy helps to align the next one (we seem to take quite a bit of time aligning panels, sometimes as long as 10-15 mins trying to get it perfect.) Once the other side of the trailer is clean, that person comes over and follows the squeegeier doing rivets and cutting seams.

Thinking we need to train ourselves to be able to align and lay a panel by oneself and get better at aligning panels. Any advice or tips on this?

We do use the rolle pro for rivets, but I know we can get faster at this too. We try to leave a nice fairly flat open chanel on the rivets. Start at the top and prick roll v's on the bottom of every rivet, then heat 4-5 rivets at a time and roll down. I've learned that if you have a nice chanel then you don't need to prick roll the vinyl, but a lot of times the chanel gets closed off or isn't very flat.

Any advice on this?

I think I have some more youtube to watch.

typically we do 3 on a semi. You shouldn't use 2 guys to align 1 panel. If you put the first panel square, the rest show follow suit. Typically this is how we do it.

Panel 1, get it square, Lay it.
Panel 2, Align the top, check the bottom make sure it's square. tape the top of that panel, about 8 inches down put tape on both sides of the edges, wrap the top 8 inches. Remove the rest of the backing paper, stretch it down to the bot, tack it. work your way down from the top. If you're inexperienced and end up lifting and re applying because of wrinkles or what not, this might not be a good method, cause you will end up stretching it, and it won't line up.

practice makes perfect.
 

Kentucky Wraps

Kentucky Wraps
Once problem with charging based on hourly labor is the faster you turn the product around, the less you get paid.
One shop takes twice as long as we do to wrap the same vehicles. (We are more efficient, proficient, experienced, etc.)
If both shops used the same model for pricing, the customer would actually get a better price on a superior service (faster).

Not saying it's wrong or bad...just there is a potential flaw in saying the faster I get...the less money I'll make. Typically faster service costs extra with other industries.
"rush fee's etc.)
 
Top