UFB Fabrication
New Member
Most engineers will do a quick calc and charge you 100-150 bucks. Have you heard the term you cant fight city hall. Redo the drawing yourself or have it done by eng if required. The customer should have to pony up for the extra time to permit and eng. drawings if needed. As for digging a post hole 6 inches deeper that should take less time that it does to bitch on the intertube about it. To many knuckle heeds are doing stuff that blows over or catches on fire. If you dont like things the way they are and want to change things you should run for mayor or concilman and repeal the laws.