good grief what dont we know...
what are you paying to have the drawings done for the engineer if you are not qualified to do so...based upon the questions you have asked i doubt you are.
what does the engineer you use charge to review your drawings and approve
we do not know the windload requirements for your area that this
sign needs to be built to withstand which will determine the footing size and if your structure will be "OK" in your words *but more importantly accepted by the city....since you are required to have this engineered you have some additional scrutiny
so I can rattle off a price but it wont mean a damn thing and you'll have no idea if you are making money or losing money...so you'd be much better off doing the work you want all of us to do for you. if you are uncapable or unwilling to you shouldn't be building this type of
sign....additionally are you licensed to construct a
sign of this nature, not are you able are you licensed to? if you are you should be able to quote this yourself
this industry is getting more frightening by the day
there is a world of differnce between quoting 4X8 panels versus an engineered free standing structure