• I want to thank all the members that have upgraded your accounts. I truly appreciate your support of the site monetarily. Supporting the site keeps this site up and running as a lot of work daily goes on behind the scenes. Click to Support Signs101 ...

Banner pricing

anothersign

New Member
I was asked by a local restraunt for a price on 4 banners all will be the same lettering and a logo. 2 - 4x8 white banners with 4 lines of text 2 lines red 2 lines black and 2 -2x4 white banners. my estimate was $753 and some change. 1 hour later i get a call from the customer she says they called there other supplier they will do all 4 banners for $450.00
Am i nuts or is this guy giving it away? i have done 3 other banners for this company before and we save the business and got the job. I explained to her i could go to domino's pizza and eat for $10 why would i go to her pizza place and pay $40 she says our pizza is better so i asked if she would want the same banner at her location as domino's she said point well taken and she ordered from me. Am i to high priced?
 
Not for vinyl...the other had to be digital.

You must learn to explain thge benefits of a vinyl banner vs. digital

1. Longevity
2. Ability to change certain parts

All of this equates to a quality product. Many here may chime in and say that digital is just as good, and it does have its place, but that is apples and oranges. The greatest advantages of digital are faster output (less labor) and full color.

You should also try and get and meet someone nearby with a printer, as you will on occasion need digital banners.

Congrats on the sale!
 

Flame

New Member
Your prices are fine, but the other place is probably printing. That's probably what I would charge ($450) for those banners NOT hemmed and printed on 13oz material. I would charge almost double for vinyl though. Like he said, apples and oranges.
 

wildside

New Member
so why would vinyl be charged double over printed?

vinyl is cheaper to do, but it actually means you have to physically work

printing is less labor, but a $15,000 and up machine to do it

it is Friday morning, and still waking up, but i have trouble following the logic of a expensive machine and lower prices

the times we have a banner printed it is more expensive, say a 4X8 banner in vinyl $230 - printed $370

why? the technology, it shouldn't be given away:Coffee:
 
Mark,

100% CORRECT!!!!

That is the way it should be and that IS the way it starts. The problem begins when people, lacking in business sense, only equate costs and retail prices with labor.

The benefits of labor saving technology, IMO, are to be savored by the user. The equipment cost should be compared to that of an employee - but most often it is not.

No way, no how would you see a small business pay an employee to provide "free" work, with no monetary gain somewhere - BUT it is accepted practice with technology.

20 years ago, when computers truly went mainstream on cars, a gentleman came in wanting me to scan the car at no charge. Knowing that this guy was just wanting information, to repair the car himself, "I" informed him of the "basic" charge. His response was: "No - you need that equipment to work on my car", my response: "NO - YOU need me to have the equipment to work on your car".

In relation to signs, a customer needs to have a vendor with a printer - if they want full color printed banners - NOT a vendor needs a color printer to have cusomers, as is often thought and practiced.
 

RobGF

New Member
You know, I don't actually have a problem with $450.00 for those banners printed digitally. There could be a very good reason why that is the price your competitor charges. If he (she) has a true solvent machine, he can no doubt produce this on a 13oz scrim for less than .40 sq ft. If the competitor has a middle of the road machine like a ColorSpan, the whole printing process will take about 30 minutes. There would be 30 minutes of labour taping and punching the grommets with a press.

In this example, the competitor is making money.

I can also see this job costing more if the producer choose to use a premium scrim vinyl, send out for stitching, etc.

Until a fellow knows exactly how the banners were produced (materials, machine, time of production, etc.) it's not really fair to say he's expensive or cheap.

Of course my thoughts are my own and I'm usually full of shit.
 

Flame

New Member
Wildside Graphix said:
vinyl is cheaper to do,



Wrong. A 4' x 8' banner blank would cost me about $20, plus about 6 yards if vinyl (minimum), and intermediate vinyl would cost atleast $2 a yard, so let's say $32 minimum cost for a banner like this. Printed, it would cost me about $0.45 a square foot, which would mean that a printed banner would cost me $14.40. PLUS, the labor would be conisderable smaller. Like I said, that price doesn't include hemming. So all we would have to do is cut the 4 edges and put in grommets. Around 10-15 minutes. Where applying 2 color vinyl could take up to an hour.

Beginning to see how it would be cheaper to print?

I could sit in my shop with just me, my printer and my table and make $1000 a day easy. Did it last week. No one came in, I just sat and printed banners and made some moolah.
 

wildside

New Member
Flame Master said:
Wrong. A 4' x 8' banner blank would cost me about $20, plus about 6 yards if vinyl (minimum), and intermediate vinyl would cost atleast $2 a yard, so let's say $32 minimum cost for a banner like this. Printed, it would cost me about $0.45 a square foot, which would mean that a printed banner would cost me $14.40. PLUS, the labor would be conisderable smaller. Like I said, that price doesn't include hemming. So all we would have to do is cut the 4 edges and put in grommets. Around 10-15 minutes. Where applying 2 color vinyl could take up to an hour.

Beginning to see how it would be cheaper to print?

I could sit in my shop with just me, my printer and my table and make $1000 a day easy. Did it last week. No one came in, I just sat and printed banners and made some moolah.

look at it this way......

ok, your material costs are $32 like you said, and an hour of labor at say 50 bucks, so you got $82 into the banner, this would include your overhead and everything into the hourly rate

so your printed banner costs $14.40, plus say an hour of labor, because the customer actually wants a finished banner with hems that will last at the same hourly rate. so your at $64.40

now the cost difference is $17.60.......what is your lease payment onthe machine, rip software, etc??????

i am betting it takes a whole lot of work to even get up to those payments, because a digital printer and supporting equipment should bring your hourly labor charge up higher than 50 and hour

if we went an entire week with no one coming in, we would question our sales ability and question our reputation, don't get me wrong i think its great you can sit and print and not do any labor and make a lot of money, i just don't think that the technology of digital printing should be given away at such a low rate

in the future digital printing prices will drop, that is a given, but quality work and solid sales ability can keep the prices where they should be for some time......we get low balled alot, and it doesn't hurt us..

...matter of fact, recently we bid on a job to put a site sign up for a property for sale, they thought we were priced to high for the posts and panel, and ended up going with a company that put up two posts and a banner between to save $200 came to find out....a week later the banner ripped down, the were charged again to put up the same banner again, now they have already spent more than our permanent solution would have cost...and guess what it ripped down again....now they have paid 2 and a half times more than what the original would have cost, now that we have fixed the problem for them at our original price:thumb:
 
Flame,
We all know that the print process is cheaper.

The questions are:

Why give away the cost of technology?

While everybody talks of cost per foot, NOBODY talks of the costs to maintain a machine. Piezos are good for a certain number of shots - period. Then they are junk. Epson's piezos, and their proprietary variations are not cheap.

What is the real world cost of maintenance?

What is the cost of wasted product? (Mistakes, machine failure, etc.)

What is the lifespan of a machine?

What about the initial required investment?

Why aren't all the facts factored into the pricing? (All of the above, plus interest, software, etc)

Digital printing has its place, and its uses. Without real numbers, it appears most printer owners are primarily "tooting" their own horn, as if they are trying to "put perfume on a hog", or better yet, "the blind leading the blind" - when they talk about how much the output really costs.

Many here know that we also own a wrecker service. Competition is extremely stiff, from newcomers. They buy a truck for 75k, and think they are making money - UNTIL the first brake job at 40,000 miles, which sets them back $1500, or the first set of tires at 50,000 miles, which now sets them back an additional $2200.

There is a lot more to costs than the price of scrim and ink.
 

Flame

New Member
Well, you just added in the FINISHED banner part. Our prices go up for that of course. Whether we actually sew the edges or just use the tape, it's atleast a 10% increase in price, and goes up from there. A lot of people just want a banner for a year or two and these non-hemmed guys work fine for them. If someone wants durability and a banner that will last, then we will hem them.

So yes, for hemming it will probably add 15-20 minutes, getting us closer to an hour. But for just cutting and grommeting, I'd still say 15 minutes, 20 tops. Which would mean if we were in a rush job order, that would be 3 banners an hour. Now, the printer takes longer than that, but we've learned how to work around that. While it's printing one job, we work on another. Such as finishing a banner, installing vehicle graphics, or running the plotter. If done properly, you can keep the machine running all day straight and it will never slow you down.

I'm gonna go get my coffee now. Just thought I would add that....uh...thought.:cool:
 
A lot of people just want a banner for a year or two and these non-hemmed guys work fine for them

No way you can hang a banner without reinforcement. Unhemmed banners are for indoor use, and flat wall exterior use. Not good business - but to each their own - I guess.

you just added in the FINISHED banner part

Other than wholesale, to another sign shop - why would you sell an unfinshed product to a customer?

Also, refer to the questions above. Those "other" number are never spoken BUT they DO exist, and affect final cost. If we have to pay for - so will the customer.

for hemming it will probably add 15-20 minutes, getting us closer to an hour. But for just cutting and grommeting, I'd still say 15 minutes, 20 tops

By your numbers that adds almost one hour - that should be an additional $50 to $75 per., and yet NOT calculated in the footage price.
 

Flame

New Member
Hemming or stitching adds time, and costs the customer more. Like I said, its 10-20% more a square foot.

And I've seen non hemmed banners last outdoors for up to 5 years. I did a $10,000 banner job several years ago, no hemming at all (just put the grommets deeper into the design) and they ALL are still looking fine. I would heartily agree that hemming is a much better alternative, but some people want to stay cheap. So I tell them, no guarentees.

As far as the cost of technology, well I have a 2 year service agreement plan with my printer, and if ANYTHING goes wrong with it, I get it replaced. Works sweet. It's pretty cheap too. And wasted product...well, sure, you go through some. Not enought to really add up to much. Unless you're using like reflective or Controltac, material is cheap.

I don't feel like argueing much more about banner pricing. Obviously we both see it different ways, and I know we've gotten into this on here before. Let's stop it before tempers flare up.

:thankyou:
 
Nobody's temper flaring up. Bottom line, if you have to pay for, it comes out of the bootom line. The little things we take for granted are the things that cost us the most.

Do you, or anybody, save spare change, or throw it in the trash?

Note: I am not talking about scrap material, that should be charged for, in the job, and usually is.
 

mark in tx

New Member
I look at pricing this way, whatever the market will bear.

Keeping in mind that it will take 30-40 car wraps, or 1000 banners to pay for that printer. And it will take 10-20 more car wraps, or 200 more banners to pay for the related costs, labor, materials, electric bill, etc... to pay for that printer.
 

2NinerNiner2

New Member
Have to agree with PS&G, especially post #10. How much 'per square' is your rent, power, heating (or a-c), insurance, telephone, cell, advertising, wage, taxes, accounting, business license, office supplies, (to yourself), maintenance contract renewal (after 2 years) and on and on... :)
 

Flame

New Member
2NinerNiner2 said:
Have to agree with PS&G, especially post #10. How much 'per square' is your rent, power, heating (or a-c), insurance, telephone, cell, advertising, wage, taxes, accounting, business license, office supplies, (to yourself), maintenance contract renewal (after 2 years) and on and on... :)

$1000 a day will more than get me by. I need to make $200 a day to skate by and pay all of my bills. Making 4-5 times that just gives me more money for toys.:Big Laugh
 

ENTDesign

New Member
Assuming 1 sided, I would probably be ~$600 plus any art charge needed.

I only do cut vinyl, and I can't see any way to get into doing printing with the bottom barrel pricing I keep reading about here. 2 years ago you had to pay about $10 - 12 /sq ft for full color printed vinyl. Now it seems too many of you are "happy" getting $4 - 5/sq ft retail. Crazy....
 

anothersign

New Member
Thanks guys

I agree with fireside why give the work away? i could make a nice banner with a crayola for the price of the banner $30 and the crayons $2.99 but i would not even sell that for 450. Well him trying to give away his work failed him. I have done about 5 banners in the last 4 weeks for this pizza place and i only sell them 14oz hemmed and grommets & laminated. They have never even checked my prices before this to my knowledge atleast but this was a new lady i have never dealt with before this but i talked to her again this morning and there happy with the quality and fast service i give them so they will stay with me. The other guy they called told them he would get them a price in 30 min he called back 3 1/2 hours later in that same time i had sent 5 proofs and 4 call to her to get the layout right.
 
Top