Look up there' its a bird,a plane,no its'a sign

Vinyl Dad

New Member
Got a call from a guy Ive known for a long time.He's been in the Hardware biz for 40+ years.Wants me to "Touch up his sign.After looking at it all my life I know that it needs replaced.Im asking you all if you think this is out of place for an honest price? Its 4'x30' and on cement blocks.I have a nice alum mounting kit,Stainless hardware,Without going in compleat detail.Here is my estimate. And did I say ITS 60 feet in the air!
Remove old sign and hardware.8hrsx 35=$280
Rent a Hi lift.$125 @ day x3 days=$375x100%=$750
Main support lumber$75x4=$300x100% = $600
Pre painted alum..@ $65x3=195x100%= $390
Alum brackets x10=$250x100%=$500
Stainless hardware$125 (The client will prob provide)
Vinyl graphics 3 colors Oracal 851or651 x$8.50x120sq=$1020
Setup & Design... flat rate.$250
Labor 40hrs x $35.00 =$1400
total=$5315
Don't hold back(TELL Me like it is I can take it):Coffee:
I have used all my DEMOGRAPHIC knowledge.Thanks geary!!
 

Replicator

New Member
8hrs x $60 = $480.00
HiLift x 1.5 = $487.5
Setup & Design = $500.00
Labor 40hrs x $60 = $9600.00

Not quite sure about alll your other stuff . . .
supports. alum, stainless.

Good Luck . . . and dont undersell yourself !
 

Derf

New Member
35 an hour???? a respectable rate here is $75-$85 an hour.... at least get $55-$65 per hour.. but if you want to project an image that you are a profesional the charge like one and charge $75 an hour.

Think of all the gas, Insurance, Taxes, lease payment, your Mortgage, kids college fund.... I mean you not flipp'n burgers here..
 

thewoodage

New Member
i am also with the other guys... $35/hr. for labor isn't enough - and that's an awful lot of messing around for less than $60/$65 hr.

Just my opinion - good luck!
 

Flame

New Member
I concur about the labor rate.

Dude, This is my 5th year in the sign biz. I started out at $30 an hour for labor, I'm now at $60. If you want to cut your friend a deal, that's one thing. But if you want to be driving a 2006 Z4 instead of a 1994 Accord, or living in a 5 bedroom house instead of a 2 bedroom apartment...... bump up the labor rate.
 

Gino

Premium Subscriber
Your labor price is definitely off, even if you have two feet planted firmly on the ground. 60’ is an altogether different story and people really slow down when up that high…. let alone if they don’t chicken out first. Can you honestly work at that height ?? I did years ago, but I don’t go much over 30’ any more. Now, if you’re taking others with you up that high…. are they properly insured and if anything should happen [God Forbid], can you live with the consequences ?? In my opinion, that’s the most important question you need to ask yourself.

Anyway, you have the cost of removing the old sign and hardware…. does that include putting the new stuff up at the same time ?? If not, does your 40 hour number include re-installing the new stuff ??

Also, I don’t see any figures for miscellaneous or crap factors. You don’t count on things going wrong, but what if it does on a project this size. Based on your shop rate, this doesn’t sound like your typical everyday order for your shop. In that case, if something should go wrong, you’re butt isn’t covered at all… other than your 100% mark up. Remember, that’s mark up, not a slop factor.

Everyone needs in their overhead a down factor. When things go wrong, machines stop working, things need repairing, vacations, sick time, truck needs a new transmission, UPS wasn’t on time, the phone won’t shut up and you can’t get it all done today, little Bobby has to go to the doctor and no one can do it but you…. All these things should be another ‘OVERHEAD’ cost. Usually, it’s in your general overhead, but judging by your hourly rate, that’s barely going to cover your electric, heat and other necessary utilities and such.

No one here knows what you need to get to keep your shop doors open, but if you can actually perform this job with proper permits, licensing, insurance… and you are willing to take this job…. I think you need to at least double your labor rate. AND again, if you lose money on the deal or break something, that can all be replaced, but up the high, people’s lives are at stake…. ARE YOU WILLING TO TAKE THAT CHANCE ???
 
Last edited:

gbahue

New Member
Hey Dad,

I just passed on a 10 x 40 because it was a cluster. If you have never done this I would go 3x on your price. You are shy on your lift costs, hourly rate, vinyl and design costs. Is there someone else in your market that you can sub it to and keep your feet on the ground?
 

Vinyl Dad

New Member
This is a large project for me.I have done one at 30' in the past and the lift is at a cut rate from a freind.(The wind at 30' sucked) Remember this is a old guy in biz a long time and with Homedepo/Lowes around now.I don't think he will go for it.At first I thought most of you big city guys(don't take that wrong)Were high on the labor because of your areas.But when woodage posted to raise the labor I was shocked.Been to his/her area Its not much different then this one. Thanks....My shop rate just went UP. Gotta go Later
 

onesource

New Member
Labor minimum $60.00 for friends or close business associates
$75 up normally
I install large pylons regularly and hopefully I can give you some insight.
Say your taking responsibility for this and you install it.
Windload at 60'-----I would assume the poles are big enough at 60'
You need a steel frame not lumber and the faces need to be pop rivited to the frame. I think I understand you are using lumber.

If you are installing over the posts then you need to take in cosideration the design of the structure with saddle mounts.
If you are installing to the front of the poles with clips then some will need to be welded good to the posts. If you have the distance measurement between the poles then you can have it all ready on the ground, lift and weld (real good)
If the poles are 30' apart which I don't see much, you will have to build a heavy duty structure(frame) bigger the gap the stonger the frame.
If you do not do this much sub a local sign co. and add a little to the top,
besides they should be insured.
It could end up being a little more involved than you think at 60'
Your figures may change quite a bit.
I hope I understood your install
Hope this helps
 

Vinyl Dad

New Member
Onesource.Thanks for the Info.The sign is mounted to a block building and the old sign is steel with steel mounting.Rusty with rust stains down the building.I got up on the roof today.Not my cup of tea!!!Im going to call a sign constrution co in the morning,to see if they can look at installing a sign I designed and made.The owner took my wife & I to dinner tonight.I told him my plans.Ill make out on the layout on the sign.I thought it was funny when I told him my shop rate.He said is that all!Go figure. Im a one man band.Its all I can do with my feet on the ground.They don't make them like that guy any more.Talked him into some window signs also.Thanks for the help guys...
 