Express Sign
New Member
To those of you who have been in this industry a lot longer then myself, I always thought that you need to have a direct labor rate per hour for jobs so that you can recover salaries, benefits, etc on labor time. However does it make sense to have a sq footage labor rate?
The reason I question this is because we have been asked to install over 650 sqft of vinyl on a barricade ground level and then to get the poles to the desired height will need a ladder or bucket truck to complete the install. The company its for didnt want our labor rate per hour they wanted our sq ft install rate.
How long do you think a job/install like this would or will take? I am just going to quote it on an hourly basis and if they like it the like it not sure what else to do? I am figuring a days worth of work with travel....sound right, too high too low???
The reason I question this is because we have been asked to install over 650 sqft of vinyl on a barricade ground level and then to get the poles to the desired height will need a ladder or bucket truck to complete the install. The company its for didnt want our labor rate per hour they wanted our sq ft install rate.
How long do you think a job/install like this would or will take? I am just going to quote it on an hourly basis and if they like it the like it not sure what else to do? I am figuring a days worth of work with travel....sound right, too high too low???