sign a rama sub contract pricing

ssanchez

New Member
I did an install job for a guy who owns a sign a rama. it was two 4x8 faces of 3/16" white plex with vynil. I also installed a metal frame on a low placed 4x4 metal sign witha lexan cover to prevent vandelism. He asked me what I would charge and I told hi 60 per hour poin to point (no boom truck needed). He said to give him a flat rate for the whole thing and how ever long it took it was my problem. So I agreed and told him 225.00 for the whole thing. He agreed and we (me and my brother) went on our way. Once finished job I went back to pick up the check and his response was. hey can you cut me a break the job was real easy, I thought it was gonna be harder. So I gave it a quick thought and gave it to him for 200 even. He didn't seem too happy but paid me. I told him to call me if he needed anymore help.
My brother thinks I should have charged less. I thought since his initial response was that how ever long it took was my problem that the discount was being good.
what do you guys think. Did I charge too much or is my brother and the owner of the franchise right?
thanks,
Sam
 
Nope. 60/hr for 2 men = 240 for 2 hours.

You went on the install BECAUSE he couldn't, and many can't. It would be like McDonalds closing to make a delivery! Besides, he asked for a flat rate, and he got. Remember, if it takes you longer - your problem! He took your $225 and added $100. The rest is BS games. Stick to your guns - and fire your brother!

I still won't say much about the guy, after all, he is in the business of dealing with whiners - and it is the fool that does not ask - but a bigger fool who gives in without a fight!

How in the world can you work for 60/hr in California? We cannot even do that in Florida. I think your labor rate may need adjustment. It is 2006, not 1976! LOL

Oh yeah, I have a brother that is a customer advocate too. I refuse to do any work for him IF we do not get the going rate.
 

ssanchez

New Member
here the small guys bring down the cost big time. A guy with a truck calls himself a sign guy. and charges 50 bucks an hour. I am thinking of going to 65, and the boom work to 85. My shop is has pretty good sq ft rate so I think my over head is a bit lowe. Building is a little older but I usually meet my customers and the shop is that a shop. a little office for me the rest is manufacture and tools and materials storage:peace!:
 

javila

New Member
Sounds fair.

Had the install taken longer than anticipated, I'm pretty sure he would not have said " Here's a few extra bucks".
 

bob

It's better to have two hands than one glove.
ssanchez said:
I did an install job for a guy who owns a sign a rama. it was two 4x8 faces of 3/16" white plex with vynil. I also installed a metal frame on a low placed 4x4 metal sign witha lexan cover to prevent vandelism. He asked me what I would charge and I told hi 60 per hour poin to point (no boom truck needed). He said to give him a flat rate for the whole thing and how ever long it took it was my problem. So I agreed and told him 225.00 for the whole thing. He agreed and we (me and my brother) went on our way. Once finished job I went back to pick up the check and his response was. hey can you cut me a break the job was real easy, I thought it was gonna be harder. So I gave it a quick thought and gave it to him for 200 even. He didn't seem too happy but paid me. I told him to call me if he needed anymore help.
My brother thinks I should have charged less. I thought since his initial response was that how ever long it took was my problem that the discount was being good.
what do you guys think. Did I charge too much or is my brother and the owner of the franchise right?
thanks,
Sam

Time is but one component of your fee.

There's an old and no doubt apocryphal story about a fellow that had some big expensive complicated machine that wasn't working properly. A servicebeing was summoned and, upon arriving at the site, produced a small screwdriver and gave one screw a half-turn to the right. The machine started working flawlessly.

The owner asked how much is this going to cost. The mechanic said $10,000. The owner, apprantly in cardiac arrest, asked "$10,000 for simply turning a screw?" The mechanic said "No, turning the screw was $5, knowing which screw to turn and how far to turn it was $9,995."
 

MAB SIGNS

New Member
Not a bad idea to go to $65 for ground labor and I wonder if $85 is too cheap for bucket truck work in California? You may want to raise your rate slightly and figure your jobs tighter on the labor. The cost of insurance, maintenance, loan payments, and fuel are enough reason to pay close attention to truck rates. You discounting the install was an act of good faith in doing business with him, he should appreciate it but not expect it every time. If your accessment of the install is accurate then you shouldn't have to discount after the fact, if he is giving you consistant business then giving him a bone once in a while is good business.

Mark
 

Baz

New Member
When you are in bisness ... when your talking about an agreed upon price ... leave your feelings behind ... You should have stuck to your guns and get the whole 225$. He most likely did (or should have) marked up your price and charge the customer.

You earned your money .. he earned his. (and you just gave him an extra 25).

Dont feel bad ... I've done the same many times over. But i get more respect and less bargaining from customers when they know i am stearn on my quotes. If they dont bargain with me and stay a loyal customer i will sometimes throw a freebee their way.
 
65 for man hour - dunno. 85 for a boom - no way (I can say this because we know the cost of running equipment on wheels). Yes you may have lower overhead, but how do you plan on growing of you give everything as goodwill. Don't think for a minute that the customers are going to chip in when you need to replace that truck.

As for the guy driving that old 1972 GMC, with that thing he call a boom - well all he can really do is change lights. I highly doubt he can fab and install. I do not think you are in that class - do you?

You are at least second generation signer (unless you fed us a line of crap - and I do not think so).....not a tinkerer..think about it. Be proud of, and demand to be paid for what runs through your veins. It is only the fool that does not ask.

Do a search for Cadmn. He has a good post (somewhat recent) about charging for design services, past and present (or maybe he will chime in)

If it was too high, Mr. Franchise would have said so to begin with BEFORE he gave you the job. He gave you the job because you were already the cheapest. FIRE YOUR BROTHER! You will feel better....LOL

Oh yeah - read the very bottom of my post, from Henry himself.
 

ssanchez

New Member
Pro Signs & Graphix said:
65 for man hour - dunno. 85 for a boom - no way (I can say this because we know the cost of running equipment on wheels). Yes you may have lower overhead, but how do you plan on growing of you give everything as goodwill. Don't think for a minute that the customers are going to chip in when you need to replace that truck.

As for the guy driving that old 1972 GMC, with that thing he call a boom - well all he can really do is change lights. I highly doubt he can fab and install. I do not think you are in that class - do you?

You are at least second generation signer (unless you fed us a line of crap - and I do not think so).....not a tinkerer..think about it. Be proud of, and demand to be paid for what runs through your veins. It is only the fool that does not ask.

Do a search for Cadmn. He has a good post (somewhat recent) about charging for design services, past and present (or maybe he will chime in)

If it was too high, Mr. Franchise would have said so to begin with BEFORE he gave you the job. He gave you the job because you were already the cheapest. FIRE YOUR BROTHER! You will feel better....LOL

Oh yeah - read the very bottom of my post, from Henry himself.

I will be honest our boom is not exactly new it is fair old but we have redone the boom itself and mounted a new engine and just installed new lighting on it. Insurance is what it is with large vehicles. I like it because one, it has been paid for and also it is great since it has the ladder you can decend even when the bucket is up. It has alot of pwer and great storage. We also have a nissan flat bed truck , and a ranger truck for small ladder work. My dad was/ is oldschool neon so we think very different. He had not raised his prices in I don't know how long. I have been raising them bit by bit. What we do have is alot of tools, alot.
On the initial topic what is funny is he kept telling me that to be carefull and not break it since he had hired a guy who said he could do it and ended up scratching his vinyl work. I don't know we have alot of knowledge but it seems every time I raise my prices I start loosing business. We are good dependable and almost always on time. I am one who prefers the work smarter not harder way. We install a monuent sign, we rent the ouger take half a day in drill, after inspection install the post mount the sign attach it with bolts and put on the faces. I am assuming that is who all do it but I may be wrong. Like I said 7 years is still not long in the business but I think some of the jobs we have done made me learn and fast.:peace!:
 

Pro Image

New Member
DO NOT EVERY LET A CUSTOMER TALK YOU DOWN AFTER A AGREED UPON PRICE IS GIVEN!........The next time you do some work for the man he'll expect you to give him a break again and the next thing you know your installing for nothing.............It dosen't matter if you have a fleet of 120' crane trucks or a old bucket of rust 32' bucket truck.........The point is the owner of the sign-a-roma DOESN'T own anything and he agreed to the price before hand so as he told you.........."Its HIS problem".
 

ssanchez

New Member
Thanks!!!

I appriciate all your responses. I thought it was wrong for him to ask me for a price lowering after we had agreed and we did the job to his specs and done when we told him. My dad is semi retired. Right now he is in El Salvador were he is from, me and my brother were born here. Our grandmother had a stroke so he is out there taking care of her. He si gonna be shoked when I tell him that we are undercharging!!! So what do you guys figure 110 an hour for a bucket truck job? I think 65 is fair for a job that does not require a bucket or am I wrong there too?
thanks again, love this site!!!:thumb:
 
I don't know we have alot of knowledge but it seems every time I raise my prices I start loosing business

Change is always scary. The question we would have is: Are you losing business or are you losing money? If the answer is yes to business, and no to money - then you are not losing, rather you are weeding.

Some people strive to be the cheapest in town, and you do have to be competitive, but IMO it is far better to be known as the best, not the cheapest.

These all are just opinions, and take them for what they may be worth BUT, maybe you and your brother need to examine how you "go after" your work. Maybe become a little bit more aggressive. Hunt down some commercial developers, start looking at municipal bid requests, etc.

It appears that you are hungry for more work - you just need to find out how to go about doing that.

BTW - There is nothing wrong with a paid-off truck!
 
Dustin said in his post what I was saying after I read your first post.

The '$25' deal could have only gone 1 of 2 ways...

Way 1. You stick to your guns. He never calls you back and ends up cheating someone else out of money (I say cheating because that's what it is. You and he agreed upon it). Or maybe he even respects the fact that you stuck to your guns, you do good work, and he knows you're a safe bet on future jobs..

Way 2. You gave in on the price. Personally... I'd NEVER do work for him again...he did it once, he'll do it again.... UNLESS I REALLY needed the work... (and I'd have to be hinging on doing this job or calling Sally Struthers for dinner) I would get it in writing.

Ok, well, technically that was 3 ways...

Point being.. he did it once, he'll do it again. To you, or someone else...

Guys like that floor me! They have absolutely NO business sense about them. They have no clue on how handle an objection, or bargain....so what do they do? They act like a 4 yr old and wait till you're done to start the haggling process.

If you ever do work for them again... PUHLEESE tell us you'll get it in writing... signed in blood (preferably his) LOL... and if you DO decide to do work for him... and you go to give him a price on something... make sure you throw an EXTRA $25 in it... then you're even :)

Just my spin on it....
 

Craig Sjoquist

New Member
the agreed price was $225 .... instead of $60 per hour ...he got over on you
next time he'll try it again ....then again if you let him...badly as I need work I'd still drop like a lead balloon for a customer after 2nd time or he'd pay a increase to make up for it....cause that is just plain bull......then just to grid it in I'd tell him how honest, hard worker, quality of work I do, etc. on and on ..that part kinda dumb to say, but I'd get it off my chest lol lol ......I once hired a co. to take down and rehang 2 - 4x8 signs 30 ft high they told me $75 per hour min. .. est.2 hr said ok nothing over $200 be ok for me time spent 1.1/2 total ..they charged me $200..never hired them again... when they NEEDED me for work I overcharged them a agreed $200......we became better friends after that..still are
THANK YOU & ENJOY LIFE
 

player

New Member
Get it in writting, just laugh and say "a deals a deal!" and bill him the $225.

It is not too late to work for him again, just be sure he is aware before you start the price is the price. Also leave a clause for unforseen circumstances.

Spell out the install, but give yourself some room if behind the wall it is all chickenfeathers and newspaper holding up the old sign, not 2 x 6 like they told you. Years ago I was told by an owner there was lots to hold a sign to, and hired 2 boom trucks, and they were ther 12 hours not 2. I got a bill for twice the sign from the crane company. Live and learn, that was 25 years ago!

P
 

Geary

New Member
Sounds more like a 400 dollar job to me. Get him next time! If you don't....he's the type of guy that will try to get in your drawers EVERYTIME. Don't set a 'lowballer' precedent on yourself. That's the worst way to start out. Have more of an attitude like, "I'm cheap and TWICE the price!"

Remember, this business has changed radically in the last decade. The ONLY guys that make the big bucks in regular commercial work are installers. Make the hay while the sun shines dudes! Them thar "harvesters" aren't cheap!!! :thumb:
 

andy

New Member
The price IS the price.

If this guy is like most franchises he's knows very little about what it takes to do proper installations- I expect when he quoted the job to his client he messed up and came in too cheap- he's looking to pass the loss onto you.

This isn't your problem- as has been said if you were way out on your estimate of time he would not have been prepared to pay extra- you would have had to absorb the costs yourself.

If you are going to do work for anyone I would suggest doing things properly with everything written down. Spell out what you'll be doing for the price you are charging both you and the buyer sign it and keep a copy each.

People WILL try it on and if you haven't got everything laid out on paper you have no way of proving exactly what you have or have not agreed to do for the price.

If I use a subcontractor I negotiate the price, agree a schedule of works and that's it- after the work's done the contractor gets paid.

If you consider yourself to be a good installer then charge a fair price and you'll get plenty of work. If you can, work out a pricing menu which gives your cost for the most popular install work- leave a copy with your customers and they'll be able to add in enough to pay you when they issue quotes for the signage.
 

Arlo Kalon 2.0

New Member
I can't say in here what I'd have told this scuzz if he tried to pay me less than the agreed on price. Ya don't let people mess with your money. They pay ya what was agreed on - end of discussion.
 