I did an install job for a guy who owns a sign a rama. it was two 4x8 faces of 3/16" white plex with vynil. I also installed a metal frame on a low placed 4x4 metal sign witha lexan cover to prevent vandelism. He asked me what I would charge and I told hi 60 per hour poin to point (no boom truck needed). He said to give him a flat rate for the whole thing and how ever long it took it was my problem. So I agreed and told him 225.00 for the whole thing. He agreed and we (me and my brother) went on our way. Once finished job I went back to pick up the check and his response was. hey can you cut me a break the job was real easy, I thought it was gonna be harder. So I gave it a quick thought and gave it to him for 200 even. He didn't seem too happy but paid me. I told him to call me if he needed anymore help.
My brother thinks I should have charged less. I thought since his initial response was that how ever long it took was my problem that the discount was being good.
what do you guys think. Did I charge too much or is my brother and the owner of the franchise right?
thanks,
Sam
My brother thinks I should have charged less. I thought since his initial response was that how ever long it took was my problem that the discount was being good.
what do you guys think. Did I charge too much or is my brother and the owner of the franchise right?
thanks,
Sam