to accurately price a sign multiply the number of hours to do the job and add in the material cost with mark up.
I know this is a basic method but i have a job for example that's going to take 1 hour to complete and i have about $16 of actual material costs. Am i missing something here to do this correctly because i'm coming up with a low cost.