Kottwitz-Graphics
New Member
I have a sign that will use smalts...
My deadline is closer than I anticipated, and I'm trying to figure out a way to speed it up.
I have always used 1 shot and smiths cream, mixed 50/50. It usually takes up to 2 weeks to cure out, and I'm wondering if I don't use as much cream, will it dry quicker? Or will I run the risk of premature failure...
The area that I have to cover is 12" x 77", if that matters....
Anyone have any insite, or experience?
Thanks in advance.
My deadline is closer than I anticipated, and I'm trying to figure out a way to speed it up.
I have always used 1 shot and smiths cream, mixed 50/50. It usually takes up to 2 weeks to cure out, and I'm wondering if I don't use as much cream, will it dry quicker? Or will I run the risk of premature failure...
The area that I have to cover is 12" x 77", if that matters....
Anyone have any insite, or experience?
Thanks in advance.