• I want to thank all the members that have upgraded your accounts. I truly appreciate your support of the site monetarily. Supporting the site keeps this site up and running as a lot of work daily goes on behind the scenes. Click to Support Signs101 ...

How much deposit for electrical signs?

Doyle

New Member
What do the rest of you get for a deposit from your customer on electrical signs? I'm quoting a job right now for a cabinet sign w/ EMC (led)... which I'm sure all of you know is quite pricey. I usually get a 50% deposit on most of the jobs I do, but when I'm only marking up a sign 40-50%, the deposit will not even come close to covering the costs for an LED, or the cabinet, is it uncommon to request 75% down?
 

iSign

New Member
Are you installing it too? Pulling permits?

You final price should be well over double the wholesale cabinet.

Even if only selling the cabinet, you are probably leaving money on the table if you are only marking it up 40-50%
 

thesignexpert

New Member
Your particular mark-up aside (only you know what is marketable and profitable for your shop) you can (and should) absolutely get a 75% deposit. This is standard operating procedure for my shop with all Electronic Message Center projects. By being thorough in the estimate, taking the time to educate my client on the product and focusing on the value of the sign I have yet to have someone balk at fronting 75%.

The critical element in the whole process is conveying an undeniable sense of professionalism and competence. IF you know and understand your products, as well as communicate your confidence & expertise, you can sell the project and negotiate whatever reasonable terms you want.

You're the professional here but make absolutely sure you know your product forward and backward, inside out and upside down.


Good Luck!

Tim Evans

The Sign Expert .com
"Practical Help for Sign Professionals"
 

Doyle

New Member
I will not be installing this job, only designing and selling. I am not sure who will be in charge of pulling the permits yet, but will probably be the customer (he is a builder).

iSign, not sure yet if a 50% deposit will cover my costs or not, but don't think it is likely as the LED portion of the sign alone is going to cost over $14K. And on the cabinet sign, I am buying that wholesale as well and between the two, it is not likely that I will be able to mark it up more than 50% to meet the market prices on these particular signs.
 

iSign

New Member
OK... $14K in costs, just for part of the job... that is a little out of my realm of experience, & I can see how even 40-50% markup is way too much to lose by coming in too high... so I guess the 75% idea sounds like the ticket... or even the 100% idea
 
S

SignTech

Guest
special orders like the one you mentioned does not fall under the 50% rule for us. So getting 75% to cover the materials and some labor is fine. Just explain it clearly to the customer! Hope it goes well for you . ~M
 

Checkers

New Member
It sounds like you're not applying enough of a mark-up on the product you're selling. It doesn't matter if you're selling RTA decals or LED displays.
There should never be a need for more than a 50% deposit on a project because your material costs should never exceed 20-40% of the retail price of the job.
The reason for the mark up is to cover your expenses related to acquire the product you're selling and profit that the company needs to make.
Even though your involvement with this project may be minimal, your name will be on the invoice and you are going to be the one your client calls if (when) something goes wrong. If something goes wrong during the warranty period, who is going to troubleshoot the problem, investigate the warranty claim and make things right? If you're not equipped to handle it and and it's not you, you're going to have to pay somebody else to do it.

Checkers
 

Techman

New Member
And be sure to test hat product before it leaves the place. Get photos, and vids. If something happens to it between your shop and the pole who will be liable? If you have evidence then you will not be the one to catch the bill.
 

Doyle

New Member
It sounds like you're not applying enough of a mark-up on the product you're selling. It doesn't matter if you're selling RTA decals or LED displays.

Are you saying that no matter what I am selling, my markup should always be 100%? Aside from this particular job, lets say I am selling a 4'X8' EMC which costs me $19k, and also subbing out all the install work. I would have to price the sign at over $40k just to cover my expenses with their 50% deposit. I always make sure that the deposit I receive will more than cover my expenses, but do not see how it is always possible in cases such as this..... There is simply no way in hell I will ever sell high ticket items like this if I am trying to mark it up 100%. Am I missing something?
 

Checkers

New Member
Yes, your gross profit on resale items should be around 40-50%. And yes, that can be a lot of money to some people. That's why a lot of these EMC's are leased, not purchased outright. $1500 per month sounds a lot cheaper that $40K.

On a big ticket item like this, I would entertain a 30% gross profit ONLY if I was dealing with a reputable manufacturer, the manufacturer or its rep is doing the installation and it is a top quality product with no history of problems. This means that the project is turn-key and I only have to make calls to one vendor or subcontractor for the entire project. Also, the vendor/manufacturer is responsible for the project from start to finish.

On top of my usual margins, I still charge for my time which normally would include:
1) Initial site survey and documentation
2) Creative/Design for client approval
3) Site plans and drawings necessary for permits and/or other approvals
4) A potential second and third survey after I called "one call" to insure that there are no issues with utilities or installation of the finished product, and
5) Site supervision during installation

Unless you're highly experienced with this type of work, there is a very good chance that something will be overlooked or go wrong somewhere in the process. Amongst other things, it could be a simple misinterpretation of drawings and the cabinet could be built too big or there could be hidden damage to the EMC caused shipper. Unfortunately, most of these problems show up when you least expect it, like the day of the install when you're paying for a full crew to stand around and do nothing while you try to figure out what went wrong.

One last note, even with a 30% gross profit on material, when I add up all of my expenses on projects similar to this, I have always, at least, covered my initial out of pocket expenses with a 50% deposit.

Checkers
 

John L

New Member
You should make sure you have covered whatever your expenses are (plus at least a little more for motivation)... no matter what the percentage of total that the requested deposit ends up being.

I sold a large double sided LED signs last month. We do the install, do all permit procurement, our engineer stamped the footers and supports, we hold the state master electrical license... it's a complete deal. On that job we asked for 75% down.

On a normal set of channel cans or a lighted cabinet.. we ask for 65%...depending.. read on.

Consider this... asking your customer for a higher amount as deposit should send them the message that you NEED that money for their materials. If the deposit is a little more than your materials thats fine for you. I doesn't make you look weak.. it lets them know what outrageous prices we have to pay for this stuff.

If someone is asking for 50% down that may immediately compute to 100% markup in the mind of the customer who is looking for his best deal - or who needs that warm and cuddly feeling about all that money (whether that's so or not).

I always adjust the deposits depending on who I am dealing with, what the materials will cost, how many problems I will have with the government or landlords, etc etc etc.
 

Zora

New Member
We do 50% min upfront for all orders regardless of the job total. Terms are uncomfortable but necessary. Even if you did a non-refundable binder upon acceptance of the job 30-35%, took another 30-35% for permit obtained or final approval, and took the balance due upon delivery. Hope this helps. Money is never fun to talk about but necessary. My customers always seem to appreciate me outlining it upfront CLEARLY to avoid any mishaps. I'm not in the business of collecting money or collections, I want to make and deliver signs and keep them coming back. Ya know?
 

OldPaint

New Member
on stuff like that........I MAKE SURE I USE THERE MONEY TO BUY THE FACES AND CABINET..AND COVER SHIPPING...its THEIR SIGN, not youres!!!
and if they cant pay the remainder of what they owe......for some reason..YOU AINT OUT ANY MONEY......and you have their sign.....
or you only lose what you got in it.....for your time and work...
CYA...when buying things like this for customers.
i did a sign for a lady was $300....smart thing i did i got $100 up front..for sign material. i gave her the sign with the.."ill get you check friday(this was wed when she recieved sign) come friday....i went by her shop.........DOOR WAS OPEN, PLACE WAS EMPTY and my sign was gone.......she even took the wall sinks.....and light bulbs!!!!!! so i lost $200 but didnt lose the money for the materials in it.
 

Doyle

New Member
Thanks everyone for the replies..... this is my first LED sale so I am being extra cautious. I am working with a subcontractor who is experienced with these signs and he is also building the cabinet for me.
 
Top