• I want to thank all the members that have upgraded your accounts. I truly appreciate your support of the site monetarily. Supporting the site keeps this site up and running as a lot of work daily goes on behind the scenes. Click to Support Signs101 ...

How Much Time?

mander0104

New Member
Do y'all think it should take me to cut, mask & apply vinyl to 118 pieces of choroplast. These are mainly just small pieces (common length being 6" tall for each piece), other measurement being anywhere from 3" to 13". One color (black) putting on either #s, and days of the wk and mths of the yr. I'll be getting my local glass shop to cut the choroplast for me as he does all my cutting w/ his saw, and it'll go a lot faster than cutting by hand. Hope this is enough info to provide me w/ the right info. I look forward to hearing your replies. I'd like to call the customer tomorrow w/ the price, so any quick replies are much appreciated!:thankyou: :Canada 2:
 
There are just too many variables such as the size of the text and the font being used. Think about for a moment - 10 pcs per hour still equals 10 hours, and 6 minutes per (combined). Double that, and you still have 5 hours.

This is a perfect example of a hated job, and not one we would hunger to do.

We would say an average of $10 per piece would be close to right - but that is a lot of money for a coro product, when there are so many other nicer looking products out there for the same money - and some customers know this. On the other hand, if there is nothing to do............half a loaf may be better than no loaf.

Unfortunately, pricing is NOT set in stone. It varies from place to place (locale). It is important to know what the local market can bring. This is accomplished by getting to know the competition.

Moreover, in this case, vinyl is not a "one does all" solution - just like with any process, sometimes it is more trouble than it is worth - and customers do NOT know this.
 

iSign

New Member
is all copy the same height?

If so you should make a jig out of scrap sign materials. If the coro will be 1/4",
you will want tape a 1/4" x 13" x 2or3" pc of something that has a straight edge that all your pieces will rest against. This tapes down to your bench close to the front where you want to work.

Then some scraps about 4" x 4" at each end that will keep a 13" sign from sliding around, but even though many of your signs will be small... it has a more important purpose... holding up the 3rd scrap.

NOW the 3rd scrap will be at least a 15" long piece of something (clear plex has some advantages if you have scraps of that) that will get taped on top of the other pieces. Use double face foam tape to lift it up enough that your sign blanks will easily fit under it.

This jig idea is most useful if all the signs will have the same size lettering, because then they should all have the baseline at the same height up on the 6" coroplast blanks. So lets say you will have 3" lettering & you want it 1-5/8" up from the bottom of the sign... you will tape the clear scrap so that the top of it is 1-5/8" up from the top of the first scrap below it. This way, all your signblanks can be quickly slipped under the clear scrap all the way down until they sit against the first scrap. That last thing to do to the jig is mark the center of the 13" space onto the clear scrap.

If you set up all your copy to be cut by center justifying it... you can mark a pencil line down through the center of all of them in no time at all.

If the various size blanks are still lumped into large groups of 13" ones... lots of 12" ones... & lots of each of the other sizes... you could do the 13's first, then tape down a couple small shims to modify your jig for each batch of different sized signs. If there are too many different sizes, & not many of each... you could tape a ruler to your jig starting at the center & that would help set each sign in there centered to the centerline mark on your clear scrap. (the clear is handy to see your descenders or your round letters dropping below the baseline, & to give you the best clear look at getting your base line just right.

So, you get all your copy cut apart without too much excess paper around each one... & the centerlines marked on each of them. Then you have all your coro there & a masking tape dispenser... slap a sign centered in the jig... grab 2 tabs of tape & the copy... slip the copy down under the clear scrap until the base line is aligned with the clear scrap & the centerline aligns with your mark, stick down 2 tabs of tape... & my method would be to set aside the taped up sign & just keep doing this until you are lightning fast... if somebody else will help... they can squeegee down the copy... otherwise I would set them all up first... then squeegee them all down in another process that you will fly through because it is just the same motion with no distraction of changing between 2 process's on each sign.

I hope that explanation is not too confusing. It is honestly a very quick process in any shop that has double face tape & scrap materials around already. On 113 signs, this jig can save you hours.

Not counting typing, cutting weeding or taping... I could apply 113 signs this way in about 30 seconds each or about 1 hour.

Even $5 each would be profitable... but I'd go with a sliding scale based on sizes & trying to price it so it averages a little higher then $5 ea, but less then $10
 

iSign

New Member
This install jig is a handy tip I've used on several large sign orders over the years, so I thought I'd bump it up to give it more exposure...

...hmm, maybe I should make it into it's own "small vinyl sign installation jig" thread?
 

Mike Paul

Super Active Member
Apply vinyl to pre-cut coroplast blanks. The maximum time would be 30 seconds each equaling 1 hr. labor.

Type/Layout the copy, cut, weed, mask, trim down; 2 maybe 3 hrs. max depending on your ability and equipment.

Markup on your Glass guys labor? I'd at least double it.
 

iSign

New Member
hmmm... reminds me of that old "chopped liver" expression. :rolleyes:

don't matter how you do it, as long as you can do it in 30 seconds, I guess that is the number to work up you quote with.
 

Mike Paul

Super Active Member
How long does it take to apply a 6in. single digit number? I'm thinking I could apply 3-4 in 30 seconds but I'm the boss
not the guy working by the hour.:Sleeping:
 

iSign

New Member
Mike Paul said:
How long does it take to apply a 6in. single digit number?

I came up with 30 seconds also Mike.
(although I don't think it's just a single digit)

mander0104 said:
...either #s, and days of the wk and mths of the yr.

I'm not questioning the idea of 30 seconds Mike...
I was just observing that telling her it takes you or I less then 30 seconds each doesn't necessarily mean she can do them that fast.

I thought I was helping her out with a method that has always increased my speed dramatically. Maybe it will be useful info to someone else.
 

mander0104

New Member
I'm sorry Doug (or anyone else) if i've offended you. Your method also sounds good, which I will give it a shot, if not for this project, then for the next. I'm still just learning, and I guess everything seems to me like it should be harder than it actually is...i'll catch on one of these days, so like i say...no offense meant to anyone and I appreciate everyone's advice!
 
Top