• I want to thank all the members that have upgraded your accounts. I truly appreciate your support of the site monetarily. Supporting the site keeps this site up and running as a lot of work daily goes on behind the scenes. Click to Support Signs101 ...

Instalation Pricing

Tagdog

New Member
We are still fairly new at this. Although we have produced signs, banners, and vinyl lettering, we have not done a sign install.
An appartment complex wants a 4 x 8 sign installed between two 4 x 4 posts. I can make the sign and price it and I can certainly dig a hole and put in a couple of posts filled with concrete. My question is that I have no idea how long this will take or how much others are charging for this. The ground has nice grass growing on it so I do not thing digging will be too much of an issue. But I sitll have to dig two holes, put in posts fill with concrete, wait for concrete to dry and go back. We live in a small town and the place is close to my shop.

What would some of you charge, for this? Labor plus two posts plus bag of concrete plus mounting brackets.

100.00? 200.00?

Also the customer wants the sign placed between the posts. I saw some
"U" brackets in Grimcos catalog. They look like exactelly what I would want. Any other sugestions?

Thanks
Signs Up
www.signs-up.com
www.hcgraphix.com
www.securitygraphix.com
 

Billct2

Active Member
The ground has nice grass growing on it so I do not thing digging will be too much of an issue
:ROFLMAO: ....sorry, I've just made that mistake too many times, you never know what you'll run into. And if you want to be totally safe call "Call before you dig" first.
Simple 4x8 install on two posts set 36" in concrete (here we'd be deeper because of frost) should take one guy 2-3hours. No need for two trips.
 

Gino

Premium Subscriber
Like Bill said…. when you apply for the permits, you should be ready to call 1-800 One Call or whatever it is in your area. If there are power lines, gas lines, sewer lines, phone lines, electrical casings or whatever else… you need to know what you’re digging into before your shovel goes into soil.

We’d be using a lot more than a bag of cement a hole. Dig your holes about 14” round and 42” deep. You don’t need a real footer if you do this. Assemble your sign first, raise up into the two holes and then plop it in and pour the cement around with a few strategically placed rocks. I would think you’ll be closer to 3 or 4 bags per hole. Next, set a 2” x 3” stay front and back of each post and stake them into the ground. Go back and remove them the next day and clean up your mess.

Don’t forget while digging….. put your soil on a big piece of cardboard or tarp and take that with you when you leave. You’re installation will look better if you don’t leave a mess and you’ll create a nice reputation for doing top notch work and clean-up.

That’s a one man job and if the soil is easy digging…. about 2-1/2 hours or so plus travel time. Hard digging, just charge accordingly.
 
Top