• I want to thank all the members that have upgraded your accounts. I truly appreciate your support of the site monetarily. Supporting the site keeps this site up and running as a lot of work daily goes on behind the scenes. Click to Support Signs101 ...

Need HELP pricing a HUGE install job.

whynow

New Member
Any input is greatley appreciated. Please price realitive to your market and include you market inyour price.

Here's the deal:

We have vinyl that is being installed on a large plywood fence surrounding a construction site. The total length of the wall is 484' by 8' tall. Vinyl will be installed on ONLY 7'. Within that 484' there are 9 sections of various lengths:

A- 27'
B- 187'
C- 5'
D- 95'
E- 17'
F- 19'
G- 4'
H- 109'
I- 27'

So basically we are looking at 3388 sq.ft. of wall that needs to be covered. This will be printed in vertical sections about 5' wide.

*******PRICE ONLY THE INSTALLATION, NOT THE VINLY*****

Please include how many people you would use, a total price or a price per sq.ft., the market you are in, and estimated time to do the job.

Thanks again.
 

Si Allen

New Member
I don't install these types of jobs. I do wind up fixing them!
First a few questions:

1. Is the barricade made up by modules, either 4x8 or 8x8?

2. Are the modules "paint grade" plywood"?

3. Are the painted with a gloss or seni gloss paint?

If the 'wall' is rough plywood and /or flat paint....walk away from the job! Maybe even run away! You will NOT be able to get the vinyl to adhere properly!

Now assuming it is smooth, properly painted modules, be sure to slit the vinyl between the modules (just like on the doors on a vehicle)!!! Otherwise, the modules move and rack over time..and will pop the vinyl loose...if you don't.

DON'T bid cheap...these are a bitch to get done!
 

whynow

New Member
Thanks for the input. This is for our biggest client. We have done similar jobs, (yes, it is a bitch) just not this large. The plywood is painted and smooth enough. It is made from 4'x8' panels.

But that doesn't really matter. We have already begun printing and we HAVE to install. I have an idea of what to charge them, I am just throwing this out there to see what others would charge.

So, Si Allen, assuming you DID install these types of jobs, what would you charge your customer?
 

iSign

New Member
so I'm coming up with approximately 125 panels 4' x 7' each
labor costs to be based on safely transporting graphics in an organized manner, locating the correct one in the correct sequence & squeegeeing that beast in just the right spot to not need trimming & match up perfectly with the next one. Sounds tricky... in fact I'll bet you are probably printing oversize with an inch of duplication on each side so you have some wiggle room... but also have to trim both sides of each print, at least I think thats the way I would do it. (hey, get Bob.... he wants to install some 4x8's :Big Laugh )

I think 8 panels an hour, for a veteran & an apprentice... so 2 days, plus the aforementioned logistical considerations... $2500

I would also test my vinyl of choice on the actual painted panels... & even if I did work for that client before... I would still check to make sure there are no surprises. In fact I would check with the client, show him how well it appears to adhere... & make HIM sign off on HIS decision that it is a compatible solution
 

Derf

New Member
With The Info provided I would be around 2,000 - 3000 depending on your areas economy and your over head.
 

Si Allen

New Member
Hahahahaaaa....if my caclulations are correct, Doug would lose his a** on this job!I figure 204 5x7 panels. I would have a 1 inch overlap on the left side, and all panels nubered in sequence, such as A1, A2, A3....B1, B2, B3.

2 helpers, one to help position and tape in place, then to slowly peel the liner down while I squeegeed with a wide wallpapre brush. Then hard squeegee the right side and start the next panel...2nd helper would be finish squeegee and get rid iof the backing, plus bring up the next panel.

3 full days at $65/hr x 3 = $4680.
 

Techman

New Member
200 panels @ $50 bux each to install. 10 grand ..Flat rate ... With no guarantee of sticking.. They preped and painted.. their monster...
 

Derf

New Member
Hmmmmm.... I may second guess my price as too low.. my gut tells me $5,000 but I have no idea how long it would take to load up, clean up, and install....

However, it is hard enough to give a price when you have all the info much less when it is second hand info. I'd almost have to be there and see what the heck is involved to give an accurate price.

I just figure 65.00 per hour... How long it would take is the hard part.
 

whynow

New Member
Ok. here's the wrench in the gears. The job is in Miami, we are in Tampa. It needs to be installed by Dec 12. We called down there and some local installers gave a quote of $1.50 per sq. ft. which is way too high. I don't want to take any chances, so I am thinking of getting 3 friends, going down there and knocking it out on sat and sun.

My over head in this method would be gas, hotel and meals. Roughly about$500-700. I figure 4 guys, two 12 hr days = 96 man hours. That times $30/hr = $2880 + $700 expenses x 10% for error = $3938.

This is somewhat of rush so I feel that the final price should reflect that.

Thoughts???
 

Bigdawg

Just Me
You bet your price should reflect the fact that it's a rush. My question is on that $30/hr rate... is that your shop rate? And why so low? Just curious...
 

kalvix

New Member
Just did a wall mural install at 3.75/sqft i have been told that the range around the country ranges from $2-5/sqft so just guestimating with 3888 sqft you could be anywhere around $7k+. even as a hourly rate we are at $75/hour so it still falls somewhere in the $7+ based on what WHYNOT estimated.
 

whynow

New Member
BigdawgDesign said:
You bet your price should reflect the fact that it's a rush. My question is on that $30/hr rate... is that your shop rate? And why so low? Just curious...

Good question. I guess I should have clarified more. That is not the shop rate. The shop rate is ~$50/hr. I am pricing this as if I were a sub contractor doing this for the shop (confusing, I know).

With that in mind, would any of you change the price previously mentioned?
 

Bradster941

New Member
Stacy, I think he meant paying the men $30 / hr. for out of town, weekend work to get the job done. (Maybe not ).

WhyNow, you are over looking other expenses, such as Miami Locals protection money, Guns, Ammo, etc., and honestly, 4 guys at any Miami night club will burn through that $700 well before last call. Heeheehee.

Another thing to consider is at best, you will only have 11 hours of daylight. And doing it on a weekend, you need to make sure you’ll have access to the site though it sounds like your working with the GC. so you shouldn’t have a problem making sure the left hand knows what the right hand is doing.
Tampa to Miami, I-75 to Alligator Alley = 4 hours one way, total 8 hours travel RT. And doesn’t include the 2 - 12 hr. days for the install, though most guys would settle for $10 / hr travel time and a cooler of cold beer.

And as Stacy said, “You bet your price should reflect the fact that it's a rush.”, your in business to make a profit by providing the services you can do.

If you have any problems getting a crew together e-mail me. I’m just south of you in Venice. Maybe we can work something out.

Bradster.. :Cool 2:
 
Last edited:

Bradster941

New Member
Good question. I guess I should have clarified more. That is not the shop rate. The shop rate is ~$50/hr. I am pricing this as if I were a sub contractor doing this for the shop (confusing, I know).

Yup, I'm confused.. Are you saying you will hire 3 or 4 guys to do a weekend out of town job and not pay them?
$30.00 divided by 4 = :help:
 

iSign

New Member
Si Allen said:
Hahahahaaaa....if my caclulations are correct, Doug would lose his a** on this job!I figure 204 5x7 panels. I would have a 1 inch overlap on the left side, and all panels nubered in sequence, such as A1, A2, A3....B1, B2, B3.

2 helpers, one to help position and tape in place, then to slowly peel the liner down while I squeegeed with a wide wallpapre brush. Then hard squeegee the right side and start the next panel...2nd helper would be finish squeegee and get rid iof the backing, plus bring up the next panel.

3 full days at $65/hr x 3 = $4680.

...well, since WhyNow says "...we are looking at 3388 sq.ft. of wall that needs to be covered. "

I just figured out what Si's second helper would really be doing instead of "getting rid if the backing" ... he'd be discreetly getting rid of the extra 3500 sq. ft. of prints the client paid for.

I stand by my calculations of 125 panels at 4'x7'
 

Si Allen

New Member
hahahahahaah...yer right Doug....addition error...but a hight profit!

Now we're down to 2 days work installing.


Now it's down to $3200, plus milage.
 

whynow

New Member
Just an update,

I got a price of $.90 per s.f. ($3049) expenses included from a trust worthy local. He is taking one friend and they are going to knock it out in the weekend. I'll be charging the client $6000 for the install.

Hopefully the weather will cooperate.

Bradster, If things get hairy, we'll be calling you!!

Where is a good night spot? (nothing too fancy)
 

skyhigh

New Member
3k for doing nothing...... Can't beat that.
I'm curious as to what you charged for the prints. I'm sure its mega bucks (not that you overcharged... its just alot of prints). Will you go to supervise the job? Sounds like you are entrusting alot of money and your reputation over to someone else, but I guess this type of thing is done every day. (install companies).

ps. I would have flown down from PA for 3k.... haha. I need a couple of those type of jobs. : )
 

Bradster941

New Member
HAHAHAHA Whynow,

Been awhile since I did work in those parts, but a safe bet the good night clubs will be any where near South Beach.

Glad you got a workable solution. Road trips never seem to follow a laid out plan.. :Cool 2:
 

txsurfer

New Member
You can never charge enough for a job like this, are you going to print two of everything or are you telling me that when you get away from your shop you want mess any up?
 
Top