flyingsignmonkey
New Member
ok, I was asked to give a price on doing the graphics, vinyl and and install of a v shape sign made up of 4x4 posts and two 4x8 mdo signs.
it was 36 sq ft of printed graphics with laminate also a logo and then vinyl lettering covering the rest it was 5 colors plus.
I qouted them a price that broke down to 26.50 per sq. ft. installed. so digging, putting in the posts, attaching them and the drive out to this location a half hour from my shop. came to 1,696 dollars. and the feedback was unpleasant. this from a co. trying to sell upscale home lots starting at the high end of 400,000 dollars per lot no home.
the prints were priced and would have been outsourced to a shop I collaborate with and do subcontract installation work for becuase they have a printer. it came to 360 just for the print work, not including my cutting all the other vinyls purchasing the other material such as the two sheets of mdo and the posts. I feel like I was in the ballpark, but apparently not.
any thoughts guys? if you look in the new guy forum I posted an introduction hello with a kind of bio that explains my situation a little bit.
also I spent a lot of time in a shop that I believed often thru thier services away at foolish prices just to get jobs when I knew the time it took wasnt going to get covered and they would lose money on a quarter of ther jobs. I dont want to be that guy. I figure competitve should be good enough the cheapest no.
it was 36 sq ft of printed graphics with laminate also a logo and then vinyl lettering covering the rest it was 5 colors plus.
I qouted them a price that broke down to 26.50 per sq. ft. installed. so digging, putting in the posts, attaching them and the drive out to this location a half hour from my shop. came to 1,696 dollars. and the feedback was unpleasant. this from a co. trying to sell upscale home lots starting at the high end of 400,000 dollars per lot no home.
the prints were priced and would have been outsourced to a shop I collaborate with and do subcontract installation work for becuase they have a printer. it came to 360 just for the print work, not including my cutting all the other vinyls purchasing the other material such as the two sheets of mdo and the posts. I feel like I was in the ballpark, but apparently not.
any thoughts guys? if you look in the new guy forum I posted an introduction hello with a kind of bio that explains my situation a little bit.
also I spent a lot of time in a shop that I believed often thru thier services away at foolish prices just to get jobs when I knew the time it took wasnt going to get covered and they would lose money on a quarter of ther jobs. I dont want to be that guy. I figure competitve should be good enough the cheapest no.