• I want to thank all the members that have upgraded your accounts. I truly appreciate your support of the site monetarily. Supporting the site keeps this site up and running as a lot of work daily goes on behind the scenes. Click to Support Signs101 ...

Sign Gold mark-up

James Chrimes

New Member
Was wondering how much you guys mark up your sign gold. I believe that I read somewhere on there info that I should be marking it up about 500% but that seems a little over the top to me. Thanks.
 

WVB

New Member
I have never worked with sign gold before. So I am not sure if it is just hard to work with or what...

However, why not just mark it up the normal mark up of your shop? Why does it have to be so much more then everything else due to being sign gold?
 

Pro Image

New Member
TVG said:
Why does it have to be so much more then everything else due to being sign gold?

It cost 95.00 for 2 yards x 15 in. that why I charge more for it................

I charge double for signgold versa regular vinyl. So if the sign would cost 100.00 I would charge 200.00 for it. I use it on a lot of house # in my town. We changed to house # a little over a year ago and people like the look on the old houses.
 

WVB

New Member
Thats not my question Dustin.. I know how much it costs. It does not matter if sign gold was $500 for 2 yds. If you mark up your regular vinyl 20-30% why do you not just mark up your sign gold 20-30%? The shop mark up should not be more percentage wise then any other type of vinyl. 3M reflective cost say $100 a roll the shop mark up for that film is still 20-30%. Unless it is just that much of a pain to work with. Now lets say I am removing 751 from a vehicle takes 30 minutes to remove I would charge $30. Now if the same job was to remove reflective rather then 751 I would charge $60 for a 30 minute job.
 

iSign

New Member
if I sell real estate frames, I mark them up about 35% because people can get them elsewhere, & I want to offer my sign customers the convenience of getting their frames from me as well... w/o having to shop around...BUT... if I get a custom welded frame, while my labor to cover the time to design & then order the custom work would be added to the price anyway... I would also markup the frame more, like maybe 100% over cost because they can't get it just anywhere... as a custom service, I think it commands a much higher price & should provide a higher profit. (not just MORE profit because it's more expensive... but MORE profit per dollar)

...anyway, that was my attempt to justify the concept with a alternate scenario... in an attempt to compare signgold as another "exclusive" or "custom" product you can't get just anywhere (at least around here you can't) We gotta keep the percieved value higher as long as possible, once people start watering it down, it goes down in the public's mind & we (the sign guys/gals) all lose.
 

Techman

New Member
Why does it have to be so much more then everything else due to being sign gold?

It should and must cost more to the customer. You should and must charge more for it. IT is not contact paper. It is not vinyl. It is a PREMIUM product used on PREMIUM priced usage. So, if he wants it he has to pay for it. You want regular gas? Its cheap. You want premium gas? It costs more..

That stuff is expensieve. One mistake and you just lost a load of money. So, you should be charging enuf to allow for a mistake Plus PROFIT...
 

GB2

Old Member
I'm not sure if this is an appropriate place to do this, but since the subject of markup is broadly being discussed here, I'd be curious to know just what everybody is using as a markup basis. Could we do a quick survey? Please copy, paste, and add or alter as necessary:


Product - Markup

Transfer Tape - 100%

Vinyl - 100%

Signgold - 100%

Substrates - 100%

SignFoam - 100%

Edge Foils - 100%

Inks - 100%

Print Media - 100%

Laminate - 100%

Hardware - 100%
(Such as grommets, screws, chain, snap hooks, banner rope, etc.)

Accessory Products - 100%
(Such as sign frames, Signicades, pennant flags, etc.)

Composite Materials - 100%
(Things that would be combined into the finished product such as concrete, masonry materials, edge cap, posts, brackets, step stakes, extrusions, etc)

Custom Made Products - 100%
(Such as dimensional letters, metalwork, etc.)
 

GB2

Old Member
It may be "on the money" but it is not neccessarily what everyone is using as a markup basis. Doug indicated that he marks up retail (Accessory Products) 35%. Wil implied that he marks up vinyl 20%-30% and the Techman thinks that premium products deserve premium markup.
 

iSign

New Member
GB2 said:
It may be "on the money" but it is not neccessarily what everyone is using as a markup basis. Doug indicated that he marks up retail (Accessory Products) 35%. Wil implied that he marks up vinyl 20%-30% and the Techman thinks that premium products deserve premium markup.

Correction: I indicated I mark up ONE SPECIFIC item 35%

as for the rest of your items, I don't sell them, I use them to make signs... after 10 years, I just charge what the sign is worth without figuring out how many grommets or yards of transfer tape may be in it.
 

GB2

Old Member
So Doug, does that mean then, that you are marking up your sign construction material costs 100% in total?

The reason that I'm asking so specifically is probably related to the fact that I'm trying out the Estimate program, and that breaks everything down to it's individual components and allows you to adjust the markup on each item.
 

James Chrimes

New Member
You better estimate an extra half hour for typing also. Where I live if you tell people you are charging them 400.00 for a design and 200.00 to letter a couple of doors they freek. but if you tell them 200.00 for the design and 400.00 for the lettering they seem to feel that they got something. They dont know how much the material cost or how much prep time is involved so increase your markup their if you think you might loose it in time. Hope that I did not loose you there.
 

WVB

New Member
I have estimate and it seems more work then is needed. I don't like the fact that you can not type in exact sizing for vinyl lets say. Instead you have a slider to indicate the estimated amount of coverage of vinyl.
 

gtjet

New Member
Low cost items like transfer tape and vinyl we sell for 3.5 times the cost, $1 per sq. ft cost = 3.5 for the vinyl, $15 per sq foot cost = $52.50 but kind of like Doug we use this formatt on a printed job estimate. The actual cost incorporates our shop rate for time and a mark up or down depending on the sign it self (real estate signs have a lower markup)(store front or electrical backlit have a higher markup) in general.
substrates have a 30-100% markup (dibond vs colorplast)
Ink gets priced out with the vinyl
laminates get a %100 markup
and so on.
Design time, labor ranges froom 50-150 dollars per hour depending on the job.
A formal survey would be interesting.
 

John Miller

Some day everything gonna be different.... when I
quote=TVG]Thats not my question Dustin.. I know how much it costs. It does not matter if sign gold was $500 for 2 yds. If you mark up your regular vinyl 20-30% why do you not just mark up your sign gold 20-30%? The shop mark up should not be more percentage wise then any other type of vinyl. 3M reflective cost say $100 a roll the shop mark up for that film is still 20-30%. Unless it is just that much of a pain to work with. Now lets say I am removing 751 from a vehicle takes 30 minutes to remove I would charge $30. Now if the same job was to remove reflectiveratherthen 751 I would charge $60 for a 30 minute job.[/quote]:Oops:The more you invest in material that will sit on your shelf, the more you should mark it up.Say for instance, someone wanted a small sign gold job & you marked one tenth of the roll your stated 20-30%. That's 10% of the $90 roll...$9.00 then add 20-30%... say $2.70... you've spent $90.00 to sell $11.70 worth of material plus labor. This makes no sense. When I do a job with sign gold, usually a boat or vehicle, I figure the job as if it were a standard vinyl job... lettering, outline or shadow, application,etc then I add 1/2 the cost of the roll for a small job or the full cost of the roll for a larger job. If the job takes the whole roll, I add twice the roll cost. Hey... we're talking REAL GOLD you know, people who want it don't much care about a few bucks.
 
Top