• I want to thank all the members that have upgraded your accounts. I truly appreciate your support of the site monetarily. Supporting the site keeps this site up and running as a lot of work daily goes on behind the scenes. Click to Support Signs101 ...

Trailer Pricing

mbarden

New Member
Hello All,
Was wondering what you would price this job at. Have never done a trailer before. Was think 8 hours at my labor rate. The second question the prospective client has is what would the vinyl cost when they have to order more.
It's just your average 53' trailer with rivets.
By my calc on the vinyl i am at $350.00 for all sides. It is a premium metallic.

Thanks everyone

Mike Barden
 

Attachments

  • DSC00168.jpg
    DSC00168.jpg
    45.8 KB · Views: 173
  • DSC00167.jpg
    DSC00167.jpg
    56.5 KB · Views: 62
  • DSC00169.jpg
    DSC00169.jpg
    45.4 KB · Views: 50
  • DSC00166.jpg
    DSC00166.jpg
    54.6 KB · Views: 79

Billct2

Active Member
Are they supplying the vinyl for thsi one and want a price for you to supply vinyl in the future?
$350 sounds cheap, how much vinyl is involved?
8 hours just for application, no cut/weed/tape or cleaning?
 

Derf

New Member
$350
fight%20(11).gif
are you out of your mind?

Some thing is missing here!

Do you need to remove the old graphics?
Are you being supplied the graphics?


Even if you had a clean truck and they gave you the graphics $35O is beond cheap!
 

Che

New Member
$350 your robbing yourself! To do that job, from what i get from you, just off the top of my head it should be more around $1000
 

mbarden

New Member
The customer will be supplying the graphics for the first job. That's why i'm wondering what I should charge for the labor side of this. If I charge 8 hours of my labor rate for installation that will be about 400 plus tax. The trailer is 53' long and average width.
I have never done a trailer of this size and dont know how long it will take. I am looking for advise on how long something like this has taken some of you in the past. I don't want to be Mr. cheepy here but I don't want to blow myself out of the water either.
Thanks for your patience everyone.

Mike B
 

Derf

New Member
If you have never done one then it will take you a bit longer..

By the looks of this and if the graphics are the same in the pic I would say around $1,200 would be a fair price.

I think 2 guys can do this in a day.. if you get it done faster then go have a beer!
 

Holeshotrob

New Member
Are you removing old graphics? Are you cleaning the trailer? I would more than likely be charging around $600 per side based on having a clean trailer w/ no graphics. If you gotta remove old vinyl and wash it... wow!
 

Billct2

Active Member
I'd estimate about $1200-1400 for installation only on a CLEAN trailer. If it's dirty add another $200.
 

Checkers

New Member
If you're just installing, just charge your hourly rate, and add some money for supplies, cleaners, etc.
A shoot from the hip number for the complete job qould be in the $1200 range too. Maybe more depending on travel, installation conditions and the condition of the trailer.
I would easily add another $200+ if I was deidentifying the trailer.

Checkers
 

mbarden

New Member
Thanks guys, I am going to make this a 2 day job on the labor side and then price out the graphics seperatly. Does anyone use Chris Adcocks pricing software or spreadsheets? He seems like he has a realy good handle on things.
 

MobileImpact

New Member
$350 ? If your anywhere near milwaukee I got a couple of them for you to do. Just Kidding. Realisticlly (Is that a word?) I would be around the $1500 rate. If it needed cleaning add another $250 or so.

Good Luck.

Kevin
 

johnnysigns

New Member
this should take someone w/ fleet graphics experience anywhere from 5 to 7 hrs to install w/ one person. you'll need a scaffold setup and having the stripes in roll form as opposed to 8'1" lengths will be faster. as far as cleaning i'd recommend denatured alcohol and/or water.
 

Jillbeans

New Member
It would take me by myself two days to do that sucker.
$350 sounds wayyyy too cheap.
Another thing to factor in...
If you screw something up can you reproduce it?
Love....Jill
 

Mike Paul

Super Active Member
Have you seen the condition of the decals they want you to install? I've had a few customer supplied decals that looked like hell. Folds, tunneling, application tape bonded to the surface of the vinyl. Old application tape can be a bear to get off. Make sure they're fresh and in A+ condition.
 

JT

New Member
2 guys one day or less, at least $1200, add more for cleaning, add more for the unknowns!!!!!!
 

uneedasign

New Member
1200 to1400 here in ca. if its your first time with rivits plan on being there a
while. They take time to master. Just cleaning around them is time consuming.
 

Holeshotrob

New Member
Remember to take an old toothbrush or some type of brush to get really clean around all rivets that you will be placing the graphics over.
 

Pat Whatley

New Member
Am I missing something?

I'm thinking 4 hours, by myself, based on a reasonably clean trailer (meaning clean with Rapid Prep and paper towels, not a pressure washer)

Thiesens appears to be 24" x 20'...that's a no brainer to install. That makes the other letters about 12", again nothing to them. The stripes would be the biggest problem to me.

I'd estimate it at 1 hour for setting up scaffolding and cleaning trailer, half hour for layour, 1:15 for the stripes, 45 minutes for lettering, half hour with heat gun and rivet brush...the add 50% to this estimate to cover anything out of the ordinary.

6 hours @ $90 per = $540 installation on our lot and I really don't see it taking near that long. It's a pretty simple job.

Removal of old lettering is a whole different story that would have to be based on just the time.

Supplying the graphics would be $810, plus installation.

And yes, I've done quite a few of these. If it's your first get some help. The length is going to make you glad to have the extra set of hands around. See if they'll accept just an estimate from you then bill them based on your actual time. Your $50 and hour rate is too low.
 

johnnysigns

New Member
i think you're right on the money pat. i think the higher #'s are just from people w/ less experience w/ this type of installation work.
 
Top