It's not common for me to ask for pricing..help.. it's rather embarrassing
I keep second guessing myself, and want to make sure i'm not missing something...So i had to get over my pride and ask...

I have established a base on how to price something like this, but
would really like to hear other suggestions...maybe one of you have done something like this.

What we're doing
We're working with a national company to redo 2000 taxi toppers. (see picture)

Our part of the job is just to install the graphics on the toppers.
2 pieces. 16" high x 54" wide. per vehicle.

This is what i'm thinking. Rather then say so much per vehicle, i was going to charge them per day.

They said they could have between 50-100 for us to do a day.
So i averaged about 5-7 minutes per topper. (cleaning/install) that's about 65-70 per day done. Then charging them my hrly rate for the time we spend there each day. Which would be around $600 per day. (7hrs)

Would this be more effective then charging per unit?


Anyone have any suggestions.. again thanks...
Fred you seem to always have some idea to make things like this work, what do you say?

Thanks again everyone.
 

Attachments

  • nyctaxitop02.jpg
    nyctaxitop02.jpg
    52.9 KB · Views: 6

Circleville Signs

New Member
Always charge by the unit. ALWAYS.

Here's why. As you get going on these you will get into a groove. That 5-7 minutes/per will get reduced, and rather quickly. Why limit yourself? Internally if you want to figure it out as $600/day, than you are charging $6/unit.

Otherwise they might expect future work to be done on a day labor rate...And it might be totally different work.

Just my $.02.
 

HulkSmash

New Member
That was one thing i was worried about. This is one of the things where i was second guessing myself. Thanks for responding.
 

Fred Weiss

Merchant Member
Unless I read incorrectly, your method would have you charging them the same no matter how many per day they brought in. I would quote an each rate that you can live with but based on the daily rate / the estimated average number per day.

$600 per day / 100 = $6.00 each

$600 per day / 50 = $12.00 each

Splitting the difference = $9.00 each
 

HulkSmash

New Member
Unless I read incorrectly, your method would have you charging them the same no matter how many per day they brought in. I would quote an each rate that you can live with but based on the daily rate / the estimated average number per day.

$600 per day / 100 = $6.00 each

$600 per day / 50 = $12.00 each

Splitting the difference = $9.00 each

Thanks for responding.


They said they could have 50 - 100 per day for us to do.
So those days where there's only 50, i would charge them for the amount of hrs i was there. For example if it was 5 hrs it would be 425.

It looks like pricing per unit would be better..
 

HulkSmash

New Member
Ok Fred based on your advice.

they now want me to quote in qty's of 500's up to 2k

After talking with out installers i think the following is do able. we can punch these out fast.

500 - 9.00 ea.
1000 - 8.50 ea
1500 - 8.00 ea
2000 - 7.00 ea.
 

Ken

New Member
I guess it could fall apart a number of ways..notably..if the required items are not available per day. You send an installer ...and they have only 20 units on hand...
Cheers!
Ken
 

ProWraps

New Member
50-100 taxis per day in a single location during business hours? unless im missing something here, i smell BS.

like mentioned above, be prepared for what they say, and what they do to be two TOTALLY different things.

main reason, the national sign company will tell you anything. the guys running the taxis will give two mad shits about you and what you have to do to their vehicles.

been in that situation MANY a time. as far as pricing. tough one. i would charge per unit, with an agreed upon minimum. that way if you show up, you stand around for 10 taxis all day, your covered. vice versa, your not getting paid a daily rate to do 902987234987234 taxis if that miracle arises.
 

HulkSmash

New Member
50-100 taxis per day in a single location during business hours? unless im missing something here, i smell BS.

like mentioned above, be prepared for what they say, and what they do to be two TOTALLY different things.

main reason, the national sign company will tell you anything. the guys running the taxis will give two mad shits about you and what you have to do to their vehicles.

been in that situation MANY a time. as far as pricing. tough one. i would charge per unit, with an agreed upon minimum. that way if you show up, you stand around for 10 taxis all day, your covered. vice versa, your not getting paid a daily rate to do 902987234987234 taxis if that miracle arises.

Thanks Chris, I was thinking the same thing with a minimum. This is a solid 20 days install job, and that's a lot of other jobs i could be scheduling in.
 

ProWraps

New Member
exactly. thats the big factor right there. your nut, and your opportunity costs. those could far exceed profit on a job like that.
 

Pat Whatley

New Member
I've always had a problem when somebody gives me a quote with figures like yours. I always feel like they just pulled the prices out or their butt. I know, I know, it's a personal problem but I'd be more comfortable if I got quoted figures like:

500 - 8.90 ea.
1000 - 8.55 ea
1500 - 8.10 ea
2000 - 7.05 ea.
 

Gino

Premium Subscriber
Your pricing is based on everything going right. If you get some tough ones in there, someone hurts themselves, piss breaks, smoke breaks, job interruption...... or any other reason that you can't get them done in your 5 - 7 minimum.... you're screwed.

You are not allowing for Murphy's Law.

If you want to price bulk like that..... don't forget to add in down time, their not getting things to you on a timely basis and so many other things that could go wrong. $9. a pop seems way too cheap to me. However, if you think in quantity for pricing, nothing wrong with getting a slice of the pie. If everything goes right, you'll have about an $18,000 invoice with little cost out-a-pocket. If things go wrong it could be lots out of pocket but still only $18,000. You are the one running a risk. Pad that risk with some extra money.

Also, in your quote, make sure you are allowed to bill this out in phases. Get a deposit for the first 500 toppers or so and have an on-going billing taking place.
 
Show Media Hi impact tops... Know them well...

Are you printing or just doing install?

This is down and dirty work not much margin. You will not get the job for any of the prices above.

The vinyl used is usually Flexcon 5200 lite cal with 5 mm lustre lam. Total 9 mil product. super removable translucent so not much prep Just peel em off and lay the new ones up. They usually are only on the cabs for any more than 4 week campaigns some only up for a couple of days.

The Guys that install for Show apply wet with soapy water. Takes them about 4 minutes per both sides.(no joke) they will bang out 1000 cabs in a few days. Many times the installers just go to the airport and do removals and installs on the fly as the cabs are offline waiting for work. They work really quick...

Here is a BR campaign we did for them last month for 2500 cabs.

URL Removed Due to Malicious Script

Adam give me a call if you want a little more info...
 
Last edited by a moderator:

HulkSmash

New Member
Show Media Hi impact tops... Know them well...

Are you printing or just doing install?

This is down and dirty work not much margin. You will not get the job for any of the prices above.

The vinyl used is usually Flexcon 5200 lite cal with 5 mm lustre lam. Total 9 mil product. super removable translucent so not much prep Just peel em off and lay the new ones up. They usually are only on the cabs for any more than 4 week campaigns some only up for a couple of days.

The Guys that install for Show apply wet with soapy water. Takes them about 4 minutes per both sides.(no joke) they will bang out 1000 cabs in a few days. Many times the installers just go to the airport and do removals and installs on the fly as the cabs are offline waiting for work. They work really quick...

Here is a BR campaign we did for them last month for 2500 cabs.



Adam give me a call if you want a little more info...

Thanks mike and gino.

You're right Gino, I'm pricing this based on nothing going wrong. I can't see them accepting a quote more then what i Originally mentioned above. I'm going to set a minimum just in case they only have a day with like 16 cabs...

Mike, they're suppose to send me what material it is, still waiting on that.
thanks for the tips.. ill give you a call in the AM... thanks again