klemgraphics
New Member
Ok so I have a connection through a friend of a friend with the advertising manager or something like that of a rather large(worldwide) furniture manufacturer. I was instructed to give him a call so I did and I was told that they are interested in re-branding some of there fleet. This will consist of about 20 53' trailers that will be done over a period of about 2-3 years. They do all of their own design work, just need someone for the production.
As always price is a concern and that is why they have not been completed as of yet, so basically if I come in cheaper I get the job. My question is, do I ask what they were quoted?? From what he told me, they have been having everything printed by someone and then hiring in an outside installer. Heck maybe I wont be able to compete. Or do I just quote them a price on the high side and when they say it's too high ask them where we need to be at in order to get this done.
I really want to get this account, as I think it could be very good for my business as far as referrals go. I am slowly but surely working my way into more and more large local companies.
I will be meeting with them on Friday to discuss the details so I really want to have all my ducks in a row and not go in there looking like I don't know what I am doing. Don't want to be duped into doing them for nothing though either.
As always price is a concern and that is why they have not been completed as of yet, so basically if I come in cheaper I get the job. My question is, do I ask what they were quoted?? From what he told me, they have been having everything printed by someone and then hiring in an outside installer. Heck maybe I wont be able to compete. Or do I just quote them a price on the high side and when they say it's too high ask them where we need to be at in order to get this done.
I really want to get this account, as I think it could be very good for my business as far as referrals go. I am slowly but surely working my way into more and more large local companies.
I will be meeting with them on Friday to discuss the details so I really want to have all my ducks in a row and not go in there looking like I don't know what I am doing. Don't want to be duped into doing them for nothing though either.