Ok so I have a connection through a friend of a friend with the advertising manager or something like that of a rather large(worldwide) furniture manufacturer. I was instructed to give him a call so I did and I was told that they are interested in re-branding some of there fleet. This will consist of about 20 53' trailers that will be done over a period of about 2-3 years. They do all of their own design work, just need someone for the production.

As always price is a concern and that is why they have not been completed as of yet, so basically if I come in cheaper I get the job. My question is, do I ask what they were quoted?? From what he told me, they have been having everything printed by someone and then hiring in an outside installer. Heck maybe I wont be able to compete. Or do I just quote them a price on the high side and when they say it's too high ask them where we need to be at in order to get this done.

I really want to get this account, as I think it could be very good for my business as far as referrals go. I am slowly but surely working my way into more and more large local companies.

I will be meeting with them on Friday to discuss the details so I really want to have all my ducks in a row and not go in there looking like I don't know what I am doing. Don't want to be duped into doing them for nothing though either.
 

Techman

New Member
They do not want the cheapest price they can get.
They want reliable, qualified and worthy suppliers.
If you come in with a cheaper price alone you will not get the work.
 

Doyle

New Member
Agreed, besides, you will be very sorry for giving them a great price when they wait 90 days to pay you with no deposit.... Think about how many things can go wrong with the job, plan on needing to replace an entire set of graphics, plan on running into unexpected problems, plan on not getting paid for a long time, then look at what you were going to charge them....
 

Gino

Premium Subscriber
We've had this happen so many times over the years and you always freeze as to which way to price.

I had some where they played hardball and wouldn't budge an inch as to where you have to be price-wise. I had some that told me where I had to be, but the guy just yesterday was the best one of all.

He came in last week and asked for a price on making two small patches for some 4' x 4' panels. Told him $85 and it was a done deal. Then he asked me to price out some new panels and send him a quote. I priced out 12 double sided 4 x 4's and he came in yesterday... gave me an order for a few more patches and then said... now, we gotta talk about these other signs. I was higher by about $35 on each sign. He handed me the last quarter's worth of signs they purchased for their present sign vendor and asked.... can you at least match this ??

I looked it over and for some reason the other shop was losing money on the 4 x 4's, but the 4 x 6's and 8's were far higher than I would've quoted by far and that was the majority of their purchases... so I said, I could use a lesser grade vinyl for the 4 x 4's and meet that price. He said deal. Gave me an order for 12 of them, 12 4 x 8's and posts for all of them. He then gave me the paperwork for all of the other stuff this other shop did and said... as long as you don't go over those prices... we got a deal.

Turned out like Tech said..... the other shop was always a day late or behind schedule and this guy just wanted someone to get the job done on time... every time and I promised I could do that.

Here's a guy that gave me the other guys pricing, just to make his job easier. They got since this past August... 16 4 x 4's, 12 4 x 8's, quite a few banners and the installations were a cup a tea and right up our alley. Some days, you just can't stop smiling.

Talk to the guy and try to find out where you have to be. If he doesn't work with you... just plain ask him.... where do I have to be price-wise, since I know quality and service-wise we'll blow anyone else's doors in ?? If he still doesn't play along, then price it keeping in mind the high volume you might get here and the potential for more. Also, keep in mind that you might be doing a lot of traveling to install these, unless their headquarters is in your backyard.

Good Luck......................​
 

klemgraphics

New Member
The reason I mentioned price is because that is what they told me. He said this has been in the works for a few years already, his exact words were "if we can get the price point down resonably, I want to pull the trigger on this campaign". But by no means does this mean that I will give my work away, if it comes to that I will stay planted firmly behind the TV.
 

FatCat

Premium Subscriber
He said this has been in the works for a few years already, his exact words were "if we can get the price point down resonably, I want to pull the trigger on this campaign".

Been working on it for a few years...what are they waiting for? Could they have already gotten quotes from other sign/graphic companies? Perhaps they didn't like their prices either and just waiting for charity.

Sounds to me like the classic "champagne taste - beer budget" scenario.
 

ndemond

New Member
Gino gave you great advice, but I would like to add, since this has been in the works for a few years they most likely have a budget in place for this. Maybe funds that need to be spent before the end of the year. Ask if there is a budget in place and you will try your hardest to meet that number. Can't hurt to ask.

His budget will sometimes determine your contract details. Will the trailers come to you clean and decal free....etc.


Nancy
 

klemgraphics

New Member
Thanks for all of the great advice, I really appreciate it. As far as the traveling Gino, their main headquarters is in my backyard so to speak, about 15 minutes away, so i think they will probably be bringing the trailers to me. That was the idea anyway when I built this 70x75 shop anyway.

That's kind of how I was thinking I would try to work it but it never hurts to get a few opinions from everyone here that has more experience.
 

ProWraps

New Member
keep in mind 53' footers usually go for 5K or less. also you will need to know about removal, age of trailers, how they will be cleaned, and whose responsibility it will be for all the above.

you are looking at taking on an enormous project with a ton of variables. if you dont know what you are doing, and cant produce cheap enough and fast enough to make money, you will be in deep doodoo.

as far as pricing, on a job like that where someone already has quotes, i dont waste either of our time. i flat out ask where i need to be. if i cant be there, i tell them. if i can, i tell them. i have no time to play the back and forth game. especially when price is the determining factor.
 

klemgraphics

New Member
I do work on trailers on a regular basis, partial wraps and cut vinyl. Most range anywhere from 1-4k so I know the kind of work that is involved. Up to now I have always quoted based on clean trailers with no removal, removal and cleanup is billed as per time and material. I know some of them can be a pain, have a box truck in here right now that has been fighting me all day.
 