• I want to thank all the members that have upgraded your accounts. I truly appreciate your support of the site monetarily. Supporting the site keeps this site up and running as a lot of work daily goes on behind the scenes. Click to Support Signs101 ...

Where would you be with this?

Sign_Boy

New Member
OK here's what I came up with after figuring out what I need to order:

5' x 12' .040 Aluminum: $103.14 per sheet - total of 2 sheets = $206.28
Having supplier cut the sheets down for me (total of 24 panels) : Approximately $8.00
Total Cost = $214.28

I don't have the vinyl so..

24" x 50 yard Roll of 751 = $195.00 - Going to charge for the roll

Total cost of materials minus tape = $409.28
Divide that by 21 = Around $19.50 per panel minus cost of tape.

So if I were to go by Fred's method it would work out to be:

$19.50 x 2 = $39.00
$75 x .5 = $37.50

Price each = $76.50

Gene - That's quite a bit to swallow, thank you.
I see where you are coming from. There are times when I look at my 3 guides and average them out.
Usually I'm right on the money when I do this. Most of my problems come into play when there is a qty discount involved.
How much do I give? Will the job be a PITA? What do I feel comfortable taking off? What do I feel the job is worth and what will the market bear?

For example on this one: Price each was $76.50 how can you discount that?
10% off would be $68.85 ea
15% off would be $65.03 ea
That sounds low to me...

In a way it kind of comes down to what you feel comfortable charging.
 

Jillbeans

New Member
With all that figuring I'd say that $80 would be the lowest I would go.
Keep that in the back of your head and bid it higher so you can still CYA.
I hate that quantity discount stuff.
How much before the job is free?
My "intelligent" method was materials x hourly fee.
 

GB2

Old Member
Perfect solution Kevin! Don't forget to charge for the installation if you are doing it.
 

Gino

Premium Subscriber
Figuring your way of lettering.... the cost of the aluminum, cutting it, some computer time, weeding and applying vinyl, overhead and some profit...we'd be around $70. ea.

However, doing it the way we do now, we'd have a total of $288 in raw materials and shop time. That comes to $13.75 ea they cost me to make. I could go in at $30 and still more than double my money. Even at $60 ea, I'm making a killing.

I realize not everyone has this capability, but some people do and that's the new competition you have to be aware of when pricing. These programs and booklets don't take into consideration what some people can really make signs for these days and still make a hefty profit.
 

Sign_Boy

New Member
I realize not everyone has this capability, but some people do and that's the new competition you have to be aware of when pricing. These programs and booklets don't take into consideration what some people can really make signs for these days and still make a hefty profit.

This is true, but it's not always possible to compete with these shops.


6sq feet x $12 = $72

It's 5sq ft x $12 = $60
 

signmeup

New Member
Signmeup back away from the lacquer thinner!

Signboy said 5 square feet not 6
Yeah, yeah... I don't dick around with fractions. What am supposed to do with the little piece left over from ripping a 4 x 8 into 10" strips? The 2 x 4 off cut I can use......

Anyway, we all came up with similar prices. In the end all these estimates are guesses. You won't know how long it takes until you've made the signs. Then multiply by your shop rate and add your materials and markup. Then compare it to your guess. Repeat for years and eventually you'll just kinda get to know what they should go for.
 
Top