• I want to thank all the members that have upgraded your accounts. I truly appreciate your support of the site monetarily. Supporting the site keeps this site up and running as a lot of work daily goes on behind the scenes. Click to Support Signs101 ...

Pricing MDO Sign

ShannonM

New Member
I'm making a 4x6 MDO sign that is painted white with black vinyl and red reflective vinyl. I had to vectorize their logo and the sign has a 2" red reflec border around it. I quoted $500 and they think I'm asking too much. It has lots of wording. Price doesn't include installation. Any advice for a newby?
 

Gino

Premium Subscriber
Post a picture, then we can calculate better. Indicate what is and isn't reflective.

What grade of reflective did you use ??

1 or 2 sided ??
 

gvgraphics

New Member
From what you have said I would agree with you on the price. Reflective costs more and you also have to be comped for the time to vectorize the logo or the cost to get it vectorized. Break the price down for them and show the sign cost and the cost to vectorize their logo. That may help so they don't think just the sign is $500. Also explain the cost to vectorize their logo is a one time charge. That it will be less in the future because you already have the logo ready to go.

Sean
 

bob

It's better to have two hands than one glove.
Assuming it's a one sided sign $500 is about right. I'd be $450-$500 depending on the exact substrate material. I don't do MDO except at gunpoint.

I disagree with the notion of itemizing everything. The price would be the price regardless of what I had to go through to create it. I don't charge anything special for art or design or tracing a bitmap or whatever, I have to lay the thing out anyway. Nothing is that big of a deal that I ever feel put upon, it's all just part of the job. Some jobs are simpler than others, shrug.

I work on the time tested principle of sometimes you eat the bear and sometimes the bear eats you. I always try to arrange things so that it's the former far more often than the latter. Even at that I never lose money, merely some jobs effectively net more than others when actual effort is considered. I always make money. Sometimes I have to work harder than others but the actual net on a job pretty much is the same regardless.

Both myself and my patrons find this approach far more acceptable than charging willie-nilly for every separate piece of minutiae that any particular job might entail. My way is real simple, the sign costs $500. You come back next week and want another one? It's $500. I don't have to attempt to rationalize and whine any explanation as to why it's different this time because of this that or the other thing.

My pricing is based on a combination of what the traffic will bear and what it's worth to me to do a typical job of that scope, regardless of specific details, combined with a handsomely marked up materials cost. Hourly rate considerations are usually not a player other than tangentially. I know how time and effort it should take. It it takes less or more than I figure it should, the previously mentioned bear comes into play.
 

wildside

New Member
bob said:
I disagree with the notion of itemizing everything.

i agree with this, it does open the door for someone to try and nit pick and negotiate your prices, especially the design time

sometimes we do break it down for them, but almost like clockwork they start picking it apart.....$500 might be a little high in this area, but depends on how much design time you have in to it
 

Baz

New Member
I do both .. itomize and not.
When its a logo file conversion i definately quote it as a seperate charge! You wouldnt believe how many times that forces the customer to look up a nice .eps file of their logo and save you the time.

ShannonM .. I think your fine in that price. If they want cheaper ... I'd nix the reflective ... Let them decide if they want it to shine at night or not.
 

Geary

New Member
Shannon,

I would do this in a heartbeat for 500 bucks and the customer installs. No problem saving my back these days!

I would love to get one of these a day.... as I absolutely LOVE MDO!!!! In fact, I got a really good deal just the other day on several sheets when I held up a psuedo intellectual plywood dealer at gunpoint. :wink:

~Gear
 

gvgraphics

New Member
I disagree with the notion of itemizing everything. The price would be the price regardless of what I had to go through to create it. I don't charge anything special for art or design or tracing a bitmap or whatever, I have to lay the thing out anyway. Nothing is that big of a deal that I ever feel put upon, it's all just part of the job. Some jobs are simpler than others, shrug.

For starters I didn't say EVERYTHING, I said the sign and then the vectorizing.
Second Bob, So If I bring you a logo that needs to be vectorized and it takes you 3 hours to do this correctly it dosn't effect my price? Or if it does why should a customer pay the same price twice for a single job?

I don't have to attempt to rationalize and whine any explanation as to why it's different this time because of this that or the other thing.
So your customers would be happy to know that they get double charged? The explanation is simple, no artwork fee. So thats whining?

regardless of specific details, combined with a handsomely marked up materials cost.
Those details take time and material. So there not chargable? I like to profit on jobs not give time and material away.

And as far as the nit picking, it's not very often we get customers who do that. And for the ones that do we simply explain why we charge for it and most understand. The ones that don't stay or go, simple.
 

cdiesel

New Member
I totally agree with itemizing everything. Don't charge them for the MDO and then charge them for vinyl seperately, but definitely itemize the design/vectorizing, sign panel, posts, installation. Everything that could be added or subtracted should be itemized.

Like gvgraphics said, you can't charge the same price for two different jobs. Just doesn't make sense if you're doing more/less work each time. Charge for the work you do. I'm sure your customers charge for the work they do in their line of work.

Chris
 

bob

It's better to have two hands than one glove.
gvgraphics said:
For starters I didn't say EVERYTHING, I said the sign and then the vectorizing.

'Everything' was used as a term with better meter than 'anything', not literally 'everything'. If it makes you happy, replace 'everything' with 'anything'.

Second Bob, So If I bring you a logo that needs to be vectorized and it takes you 3 hours to do this correctly it dosn't effect my price? Or if it does why should a customer pay the same price twice for a single job?

The price is the price. It's for the sign. You want another one? It's the same price as the first. I do whatever it takes to produce that work. Remember the bear? Some works take more effort than others but I charge for the product in general, not for the specific effort required for a specific product.

So your customers would be happy to know that they get double charged? The explanation is simple, no artwork fee. So thats whining?
Those details take time and material. So there not chargable? I like to profit on jobs not give time and material away.

My patrons [Burger King has customers, I have patrons] do not pay double for anything, they pay a fixed price for a work of given magnitude. I produce signs etc for a fee, I do not sell or rent my time. Nor do I rationalize what I do as selling or renting my time. My patrons have proven to be far more comfortable doing business this way than they would be with an itemized invoice if I were to ever provide such a thing. Which I would not, not just would not, could not. I don't calculate prices that way. The concepts necessary to do so do not exist in my shop.

And as far as the nit picking, it's not very often we get customers who do that. And for the ones that do we simply explain why we charge for it and most understand. The ones that don't stay or go, simple.

Again, the concept does not apply in my shop. The patron either pays my price or it does not. I do not bargain nor do I explain myself or my work habits. If someone wants something, I tell them how much that will be. Take it or leave it, but there will be no detailed invoice. In my shop those details simply do not exist. There's nothing to detail.

It's very simple...Here's the work, this is how much it is. I am sufficiently secure in this pricing model that I do not have to explain why that's how much it is. Substrate and major materials notwithstanding.
 

Geary

New Member
Bob is exactly right in how we should provide prices in our craft. I've never ever broken down a price for sign work. The idea of it just never made sense to me. It's a "custom" one-off item (okay...maybe two or three or even five hundred...it's still a custom item) at a custom price....and you don't have to explain how it got that way from your side of the deal.

Then only time I ever break down cost factors are for when I'm giving the work away and the person I'm giving it to has to buy the materials. So, in those cases, I just give them the receipt and say pay me back this much........please and thankyou.

~Gear
 

iSign

New Member
bob is NOT exactly right. neither is Gear!

...I guess I'll admit that I am not exactly right, but I do the opposite from them & it is not some willy-nilly foolishness that arrived by chance when I was looking the other way. It is how I do things because it works for me. AND, it works well.

I don't have to do anything either!
(said in the same sneary, smarmy, snotty voice you may think you hear in many of bob's posts, like I do)

But one thing I choose to do is bid on jobs. Big jobs fairly often, & government jobs quite often. When I bid, the specs of the job are not always clear. Sometimes I spend time before bidding requesting that the client make their bid request more clear... sometimes I just make my own bid VERY clear because it represents an important part of a contract. I specify exactly what I will do, in writing, & I specify what (& when) I will be paid. I get fairly predictable results in my business dealings & I also provide fairly predictable results in return. MY patrons (same voice) have proven to be quite comfortable doing business this way, as have I!

When clients want to "negotiate" their price down... they will try to do that weather or not your bill is itemized.

If they want the job for less... I ask them what they no longer want me to do? No design? No install? No gold or custom routed profile, or no color... or smaller decals?, less colors? smaller quantity?
 

Jillbeans

New Member
$600 sounds fair to me...even a bargain.
I would use SignWhite pre-finished MDO (you seal the edges) or Alumalite.
Because....
You have to prime and paint the MDO, including sealing the edges, and almost have a perfect finish.
Because the vynull will show every defect in your paint job.
And you'll have to use an enamel background, increasing the drying time, because I have trouble with vynull adhering to a latex background.
Reflective is double the cost of regular HP. You say the sign has a lot of copy. More weeding, more work, add in a cost of a new blade for the reflective too.
Digitizing a logo can take HOURS (I charge $75/hr, you'd be amazed how that quote can produce camera-ready artwork)
I RARELY itemize. Why? Because a picky client can nickle&dime you to death.
Do I offer a discount for repeat business? Not normally...it devalues the initial job and still costs me the same to produce.
I charge what I charge, they can pay it or go elsewhere. I do try to be fair, but I also like to eat and pay my bills.
love.....Jill
 

Gino

Premium Subscriber
I don’t know if I missing something in the translation here, but I don’t see how ‘ANYONE’ could tell a patron a price for a sign without itemizing it first.

You need to know what you have invested in order to quote a customer. Whether or not you write this down on a piece of paper and figure your costs, have some estimating program where you plug the numbers in and then punch in the appropriate specs, or just figure it out in your head. You need to know what the project is costing you… and then add your overhead and profits and whatever else you want to throw in for your final cost. There is no one that can just spout off a price and stick to it and hope that enough customers come in so that your method works itself out in the wash. You win some; you lose some theory, sounds awfully scary to me.

The occasional set of mag signs, a typical 4’ x 8’ or 12 at a time deals… you might try shooting from the hip and get away with it, but if you’re doing that across the board as you’re indicating, I don’t see how you keep your doors open. As Geary said, this is ALL custom work [anyway, in our shop it is], how could you possibly know what something is going to cost [the customer] from your own experience on every job ??

Anyway, after you figure all this out, I don’t think you need to justify yourself and itemize your numbers for the customer… no, he/she gets a price and that’s all they get, unless they change the parameters on you… then it’s back to the drawing table for a new set of figures, but not that they see.
 

CenturySigns

Custom Sign Shop Designer
Just like out sign work, I don't think everything should be black and white. Seven years ago I was the sole owner of a sign shop that had been around since 1898, and I never broke anything down. Well for various reasons, some of which were out of my control, I closed the shop.Most of the time I made a fairly good living out of it. I left there and am now a designer for a shop that is in the same town and started one year before I became a partner in my previous shop(1979). The present shop has 20 employees, we span at least 150 miles and have a new building that houses six large install trucks, a fabrication area, offices, art room, router room,yada yada. and you better believe that my boss wants to see EVERYTHING itemized. He can't even hardly turn on his computer or draw a straight line but he is one hell of a business man. He lives very comfortably. That being said, I also admit that the custome doesn't usually see the itemized version of the bill or the estimates we work up for him. It's a pain to do estimates all the time but you really need to know what you product costs you to produce, unless you don't care about how many hours you work a week and what you get paid for those hours.
 

Jillbeans

New Member
Oops....I needed to clarify.
I rarely itemize for the customer...but ALWAYS for myself before I quote the sign.
I have a little mental checklist I go through before coming up with a price, based on materials and time.
I do have somewhat "set" prices for certain items, like a set of mags. But any time something extra is added, like SignGold or cleaning up a logo, that gets tacked on extra.
love....jill
 

Checkers

New Member
Hi Shannon,
As it's been mentioned earlier, a look at the design would be quite helpful when it comes to quoting. But, as it's been mentioned in other post, no 2 sign makers are (or should) going to quote the same price.
Anyway, I came up with $555 plus tax and I would use 3/4" Signal MDO that would need to be painted. The materials are HP vinyls which would be warranted by the manufacturer for a minimum of 7 years. I also budgeted 1 hour for digitizing and design.
To the others that are bickering about itemizing the invoice, I say do it. But, don't include a price on every bit of service. The client doesn't care about anything but how much is it going to cost. So, just get to the bottom line, and that's the only price that you need to list.
This is what I would put on this invoice:
1 - 4' x 6' x 3/4" MDO sign
Primed and painted white background
Lettered with black HP non-reflective vinyl and red HP reflective vinyl
Red reflective border to match logo/text
Digitize client supplied logo and layout/design
Pricing does not include installation.

The trick to a good invoice is to say as much as possible, to show the client what's involved with making the sign, but you're really not saying anything to give away "trade secrets" :)

Checkers
 

Marlene

New Member
If you itemize, not to the customer, but in your own paper work, you'll never post a "how much should I charge post" as you will know. There is no guess work to it. If you make up the MDO, charge a flat rate for painting a stock color, charge a flat rate for a color match you'll have the substrate. You must have a cost for vinyl letters as that's a pretty standard thing to do. If there are twenty 6" letters, then charge for that, if there are seventy, then charge for that. Application is shop rate and so on. It doesn't take forever to price this way and you can track your profits and where you aren't charging enough.
 

ShannonM

New Member
Thanks!

I want to thank everyone for their advice. I looked at this site for help and advice when I started my business and it continues to be my favorite web site. I re-email the purchasing agent from the company in question early this morning. I itemized the work, without prices. It gave him the chance to see how involved the sign can get. After sitting around for an hour, I got an email back saying he'd take the sign at the original price. :thankyou:
(He also said that he will be emailing me ideas for three more signs!)

Thanks to all!
 

wildside

New Member
Checkers said:
no 2 sign makers are (or should) going to quote the same price.

couldn't agree more...a similar situation came up about a month ago, guy comes in asking about a price on a Alumalite sign, 4X8 with 4 colors with logo re-creation since they had it on a business card only

so i throw some numbers together in my head, and ball park it..... then he says he has a drawing already done of what they would like it to look like...."sure bring it in, lets have a look"

he brings in a crappy drawing, with an erased price on it, that you can still see, $200!!!!!! plus $50 for install!!!..."WTF" i think to myself, i ball parked him $700 without install....he proceeds to ask why we are so much more, long story short, he got himself a 10mil Coroplast sign on two green sign stakes in a field...LOL...You think we are quoting apples to apples....LOL
 
Top